Published March 5, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Baytown, Texas. Completed plans call for site work for a water / sewer project.

Scope of Project: 1. Approximately 385,000 cubic yards of excavation for detention pond facility and all appurtenances. 2. Approximately 40 linear feet of five-foot (5') by five-foot (5') box culvert and all appurtenances. 3. Approximately 75 linear feet of six-foot (6') by six-foot (6') box culvert and all appurtenances. 4. Approximately 180 linear feet of seven-foot (7') by three-foot (3') box culvert and all appurtenances.https://www.civcastusa.com/project/62165407a0c176d6a8a8bdb9/plans 5. Approximately 100 linear feet of thirty-inch (30") RCP and all appurtenances. 6. Approximately 215 linear feet of thirty-six-inch (36") RCP and all appurtenances. 7. Approximately 100 linear feet of forty-eight-inch (48") RCP and all appurtenances. 8. Approximately 6,700 linear feet of backslope interceptor swales. 9. Approximately five (5) backslope interceptor swale structures and all appurtenances. 10. Approximately 4,000 linear feet of five-inch (5") thick, six-foot (6') wide concrete pilot channel. 11. Approximately 360 square yards of five-inch (5") thick reinforced concrete slope paving. 12. Approximately 6,000 square yards of six-inch (6") thick crushed concrete for fifteen-foot (15') road. 13. Approximately 6,500 square yards of eight-inch (8") thick lime stabilized subgrade. 14. Concrete headwall structure (35'Wx5'Hx1'T) for 1-4'x3' RCB, 2-7'x3' RCB, 1-30" RCP, with wingwalls, flap gates, and baffle blocks, complete in place. 15. Triplex Pump Station (2-21" Pipe, 1-6" Pipe), approximate twenty-four-foot (24') diameter, thirty- foot (30') deep, complete in place (including electrical panel, lighting, security fence, and access drive). A bid bond or cashier's check in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide a performance bond, a payment bond, and a one-year maintenance bond as provided for in the bid documents, for the full amount of the contract. The Owner reserves the right to reject any or all bids. substantially completed within two hundred forty (240) calendar days + Final completion shall occur not later than thirty (30) days following the date of Substantial Completion.

Bid Results

Water / Sewer

$4,561,715.00

Public - County

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
194
Bidding Soon
3,355
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.