BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a playground / park / athletic field in Dundee, Florida. Working plans call for site work for a playground / park / athletic field.

Complete construction and scope of the design-build services to construct a 1000 square foot pass-through splash pad with multiple above-ground features, and in-ground spray features. The proposals require the following: PHASE #1 Design intent: Design and install a 1000-square foot splash pad • In-grade spray features to include various types of nozzles for play activities for all ages and abilities • Above-grade features to encourage interactivities for all ages and abilities • Approximately 100 GPM or less before sequencing • Electrical activator system with sequencing capabilities Spray features: • Above-ground spray features must be 304L stainless steel • Above-grade spray features must-have anchor base system (Epoxy, resin, or bolt systems will not be accepted) • In-grade nozzles should be stainless steel or bronze (PVC nozzles will not be accepted) • In-grade nozzle canisters shall be stainless steel or bronze (PVC will not be accepted) Concrete: • 3500 PSI after 28-day cure time • 5” to 6” broom finish concrete • Bonding of reinforcement rebar or mesh is required • Use #4 rebar 12 on center - or - W6 mesh 4” on center - or- W10 mesh 6” on center • Raise rebar or mesh with saddles 2.5” to 3” • If pouring splash pad areas at different times each slab should be joined together using rebar that should be bonded to the reinforcement grid on both slabs • Splashpad deck and 5’ outer dry area should be sloped 2% toward drain (approximately ¼” to 12” slope) • The designated splash pad shall include a 5’ overspray outside the splash zone Must be designed for 16parking areas and meet the town of Dundee specs and be ADA compliant. This parking lot should have 1 entrance and 1 exit as seen on the EXHIBIT A. This Must Be Included in the Drawings along with spacing and widths and lengths. All signage and markings must be included in the bid PHASE #2 Restroom design must include a price to supply/install a 480-square foot his/her prefabricated restrooms: • Restrooms must meet ADA appliance and all applicable requirements • Must be equipped with stainless steel sink, toilets • Restrooms must have their own power box • Septic tank (will need to supply and install) contractor will be responsible to pull the permit • 2 standalone outside showers with stainless steel fixtures (these must be shown on drawings for the project) Questions shall be submitted in writing to the Town Clerk until 4:30 pm on Wednesday, July 13, 2022.

Final Planning

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
146
Bidding Soon
2,964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2022

August 22, 2022

Project location map

501 4th St S, Dundee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.