Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Saranac Lake, New York. Completed plans call for site work for a playground / park / athletic field; road / highway; and water / sewer project.
The work consists of constructing (complete with all equipment, accessories, and appurtenances) the following in accordance with the Bidding Documents heretofore prepared by Environmental Design & Research, Landscape Architecture, Engineering & Environmental Services, D.P.C. (EDR); C&S Companies (C&S); and Ravi Engineering & Land Surveying, P.C. (Ravi): Ward Plumadore Park 1. Remove existing concrete walls, concrete steps, brick paving, asphalt pavement, cobblestone walls, and vegetation. 2. Construct new curb and concrete sidewalk at street edge. 3. Construct new lower and upper plaza spaces. 4. Install new guard railing adjacent to existing retaining wall. 5. Install new planting areas in park. 6. Repaint crosswalks. 7. Construct stormwater management features. 8. Install new vegetation at Bloomingdale / Broadway intersection. William Morris Park 1. Remove existing gazebo, brick walks (portion to be salvaged and reinstalled), ornamental aluminum fence, concrete steps, brick paving, concrete pavement, and vegetation. 2. Construct new concrete walks. 3. Reinstall pavers from new concrete walk to Carousel Building. 4. Construct stormwater management features. 5. Construct new ornamental steel fence with brick piers at park entries. 6. Install new planting areas in park. 7. Install site furnishings. Berkeley Green Park 1. Remove existing asphalt pavement and a portion of existing modular retaining wall. 2. Construct new restroom facility. 3. Construct new concrete walks. 4. Install site furnishings. Riverwalk Extension 1. Remove existing asphalt pavement, brick pavement, concrete pavement, metal and wood fences, wood deck, and light poles. 2. Construct new concrete walks. 3. Construct gabion fence. 4. Construct pedestrian railing. 5. Construct boardwalk over drainage swale. 6. Construct crosswalk. Church Street 1. Remove existing concrete and asphalt pavement. 2. Install new street trees, granite curbs, and planting areas. 3. Repaint crosswalk. 4. Construct stormwater management features. 5. Relocate curb cut including existing storm drainage structure. Woodruff Street 1. Remove existing concrete pavement, asphalt pavement, and curb. 2. Install new street trees, granite curbs, and planting areas. 3. Construct new granite curb and concrete sidewalk. 4. Construct stormwater management features. Urban Forestry 1. Remove existing concrete and street trees. 2. Install new structural soil planting areas with porous pavement. 3. Install new street trees. All questions shall be submitted in writing to Steve Breitzka with a copy to Jamie Konkoski. The subject heading for all emails shall be: Village of Saranac Lake Parks Streetscapes and Connectivity Improvements Steve Breitzka: sbreitzka@edrdpc.com Jamie Konkoski: comdev@saranaclakeny.gov A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price and in the form of a certified check or a Bid Bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of the General Conditions. No Bidder may withdraw its Bid within 60 days after the date of the Bid opening. The successful Bidder must furnish a 100% Performance Bond and a 100% Payment Bond with a surety company satisfactory to the Village of Saranac Lake and conforming to the prerequisite requirements of the General Conditions on the forms included in the Bidding Documents. The Village of Saranac Lake reserves the right to waive any informalities or to reject any or all Bids. The Village and Department of State have established an overall goal of 30% for Minority and WomenOwned Business Enterprises ("MWBE"), comprised of specific goals of 15% for Minority-Owned Business Enterprises ("MBE") participation and 15% for Women-Owned Business Enterprises ("WBE") participation.
Under Construction
Roads / Highways
$3,195,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2022
May 2, 2022
Multiple Locations, Saranac Lake, NY
Related To This Project
Saranac Lake, NY
Bid Date: Feb 15 2022
Saranac Lake, NY
Bid Date: Apr 11 2022
Saranac Lake, NY
--
Saranac Lake, NY
--
Saranac Lake, NY
Bid Date: Mar 08 2023
Saranac Lake, NY
--
Saranac Lake, NY
Bid Date: Mar 07 2023
Saranac Lake, NY
Bid Date: Apr 29 2022
Saranac Lake, NY
Bid Date: Sep 29 2022
Saranac Lake, NY
Bid Date: Nov 16 2022
Saranac Lake, NY
Bid Date: Nov 07 2022
Saranac Lake, NY
Bid Date: Oct 14 2022
Saranac Lake, NY
Bid Date: Nov 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.