BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2024 at 8:00 PM

Updated June 21, 2024

Renovation of an educational facility in Cheyenne, Wyoming. Completed plans call for the renovation of a educational facility.

Site Directions: Alta Vista Elementary 1514 East 16th Street Cheyenne, Wyoming 82001 Administration Building 2810 House Avenue Cheyenne, Wyoming 82001 Freedom Elementary 4500 Happy Jack Road Cheyenne, Wyoming 82009 Pioneer Park Elementary 1407 Cosgriff Court Cheyenne, Wyoming 82001 Project Category Code: Security/Monitoring Systems, Construction Description: The work includes, but is not limited to: 1. Alta Vista Elementary Renovations: Work to include selective demolition, minor renovations to reconfigure the main office suite and vestibule. Major components will include hollow metal frames, storefront frames and doors, glazing systems including security laminated glazing, suspended acoustical ceilings, carpet, casework, data cabling, HVAC modifications, electrical power modifications, new lighting and minor modifications to the existing fire alarm system. 2. Freedom Elementary School Renovations: Work to include selective demolition, minor renovations to reconfigure the vestibule and office area. Major components will include replacement of existing hollow metal frames with new aluminum storefront entry system, glazing systems, carpet, casework, data cabling, masonry, HVAC modifications, and electrical power modifications. 3. Pioneer Park Elementary School Renovations: Work to include selective demolition, minor renovations to reconfigure the vestibule and office area. Major components will include replacement of existing hollow metal frames with new aluminum storefront entry system, glazing systems, carpet, casework, data cabling, masonry, HVAC modifications, and electrical power modifications. 4. Administration Building Renovations: Work to include selective demolition, minor renovations to reconfigure the vestibule and 2 office areas. Major components will include replacement of existing hollow metal frames with new aluminum storefront entry system, glazing systems, carpet, casework, data cabling, masonry, HVAC modifications, and electrical power modifications.

Award

Educational

$646,800.00

Public - County

Renovation

25

17

6

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

June 3, 2022

Project location map

Multiple Locations, Cheyenne, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.