Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Sacramento, California. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
This project is phase two of the Sacramento International Airport bus lot expansion project. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. ESTIMATED CONSTRUCTION COST: $ 2,380,000.00 Question Submission Deadline:March 14, 2022, 4:00pm Question Response Deadline:March 18, 2022, 4:00pm Bid Opening Info :One tap mobile +16692545252,,1609420750# US (San Jose) +16692161590,,1609420750# US (San Jose) Dial by your location +1 669 254 5252 US (San Jose) +1 669 216 1590 US (San Jose) +1 551 285 1373 US +1 646 828 7666 US (New York) Meeting ID: 160 942 0750 Find your local number: https://saccounty-net.zoomgov.com/u/abIN8ws6vb Join by SIP 1609420750@sip.zoomgov.com Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 160 942 0750 Passcode: 693403 Contractor Award:May 10, 2022 Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a material and labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price. Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract. Award of this contract requires a valid California contractor's license with the classification identified above. Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractors license number on the bid form. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5. The County of Sacramento received final approval from the Director of California Department of Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work. This is a Construction project in accordance with Labor Code section 1771.5. Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700 Goethe Road, Suite D, Sacramento, CA 95827, and are also available. Direct pre-bid questions to the Project Manager, Steve Cooke, via the Q&A tab in the portal. ALL PRE-BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Monday, March 14, 2022 BY 4:00 pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents. The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS TO INSTALL (X) IN-DEPOT STATIONS IN THE EAST VAULT OF THE SACRAMENTO AIRPORT. The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: Sacramento International Airport East Vault Bus Lot Expansion. Which will include transportation and services necessary associated with selective demolition, excavation and grading, construction of reinforced concrete bus charging stations pads and associated electrical, trenching and backfilling of storm drain and electrical conduits, installation of curbs, drainage facilities, placing asphalt concrete pavement, adjusting electrical boxes and drainage inlets to grade, installing gates and access to employee lot, reinforced masonry wall, installation of lighting and electrical, connectivity to Aviation Drive with widening, placing pavement striping, markings, and markers, and installing signs, and doing all other work specified on the plans and in the special provisions
Award
Transportation Terminals
$2,676,762.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2022
May 23, 2022
Aviation Dr, Sacramento, CA
Related To This Project
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
Bid Date: May 31 2022
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
Bid Date: May 31 2022
Sacramento, CA
Bid Date: May 31 2022
Sacramento, CA
--
Sacramento, CA
Bid Date: May 24 2022
Sacramento, CA
Bid Date: Mar 02 2022
Sacramento, CA
Bid Date: May 05 2021
Sacramento, CA
Bid Date: May 19 2021
Sacramento, CA
Bid Date: May 04 2022
Sacramento, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.