EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 8, 2022 at 7:00 PM

Updated October 1, 2024

Site work and renovation of an educational facility in Rockaway, New Jersey. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

PN- 21066, 21020 The Morris Hills Regional District Board of Education hereby advertises for competitive bids in accordance with N.J.S.A. 18A:18A-21(a) (b). Bid No. 22-006 Morris Knolls High School Secure Vestibule Project The Project consists of renovations, alterations and construction of a new secure vestibule at Morris Knolls High School. This work includes, but is not limited to: Removal of existing doors and select demolition of other building and site elements. Construction of new vestibule structure, including, doors, windows, translucent roof panels, electrical, lighting, and all associated work, etc. Installation of new accessible lift. Renovations and alterations to existing structure and site work. All other work for a complete installation and as shown on the drawings and specified herein. The bid opening process will begin on the above-advertised date and time at the Board Offices, 48 Knoll Drive, Rockaway, New Jersey 07866. Bids may also be submitted to the School Business Administrator/Board Secretary or his designee at the bid opening meeting, prior to the advertised date and time. On the advertised date and time, the School Business Administrator/Board Secretary shall publicly receive and open all bids. No bids shall be received after the time designated in the advertisement. (N.J.S.A. 18A:18A-21(b)). The Board of Education does not accept electronic (e-mail) submission of bids at this time. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq. Statement of Ownership Requirement: Pursuant to N.J.S.A. 52:25-24.2, Bidders shall submit a statement setting forth the names and addresses of all persons and entities that own ten percent or more of its stock or interest of any type at all levels of ownership. A bidder on a public works project for a Board of Education where the cost of the work exceeds $20,000.00 must first have been qualified by the Department of the Treasury, Division of Property Management and Construction, pursuant to N.J.S.A. 18A:18A-27 through 33, and shall submit with his bid a Prequalification Affidavit No Material Adverse Change, a copy of a valid and active NOTICE OF CLASSIFICATION, a certified copy of a Total Amount of Uncompleted Contracts Form and such Affidavit that subsequent to the latest such statement submitted by him, there has been no material adverse change in his qualification information except as set forth in said Affidavit. Each bid shall be accompanied by a bid bond, cashiers check or certified check made payable to the Morris Hills Regional District Board of Education, for ten percent (10%) of the amount of the total bid, however, not to exceed $20,000.00. Bidders are required by law to submit a Statement of Ownership Disclosure form statement setting forth the names and addresses of all persons and entities that own ten (10%) percent or more of its stock or interest of any type at all levels of ownership. The bid package will also include other documents that must be completed and returned with the bid. Failure to comply with Instructions to Bidders and to complete and submit all required forms may be cause for disqualification and rejection of the bid. All contractors named in this proposal shall possess a valid and current New Jersey Department of Labor and Workforce Development Public Works Contractor's Registration Certificate pursuant to N.J.S.A. 34:11-56.48 et seq., at the time the proposal is received by the Board of Education. The Board of Education reserves the right to reject any or all bids, pursuant to N.J.S.A. 18A:18A-18, N.J.S.A. 18A:18A-2(s), (t), (x), (y), 18A:18A-4(a-c), and N.J.S.A. 18A:18A-22, and to waive minor informalities or non-material exceptions, that may be in the best interest of the Board. COVID-19 Vaccination/COVID-19 Testing--Executive Order #253 Effective October 18, 2021, all school districts must maintain a policy on COVID-19 Vaccination and COVID-19 Testing for covered workers. Per FKA Architects documents must be purchased in order to be an official bidder. All contracted service providers submitting bids/proposals to the board of education are requested to review Executive Order #253 as issued by Governor Phil Murphy of New Jersey.

Post-Bid

Educational

$600,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Membrane Roofing, Elastomeric Membrane Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Wall and Door Protection, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Wheelchair Lifts, Other Conveying Equipment, Facility Chutes
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Dewatering, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
553
Active Projects
298
Bidding Soon
5,051
All Active Projects
2,369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

April 7, 2022

img_map_placeholder

50 Knoll Dr, Rockaway, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Secure Vestibule Project At Morris Knolls High School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.