BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Summerland, British Columbia. Contact the soliciting agency for additional information.

This Request for Proposals ("RFP") is an invitation by the District of Summerland (the "District") to prospective Proponents to submit non-binding Proposals for the provision of services to collect, pile and burn the deadfall within the Istintok Reservoir (the "Project"). Isintok Lake is in the Southern Thompson hydrologic zone, approximately 37 km west from Summerland and Okanagan Lake. The reservoir is used for water storage in support of the municipal water utilities and irrigation. Over the years, removal of tree deadfall has been a labour-intensive task for District staff. The trees that reach the face of the dam are historically cut and dragged to the crest, by hand, and are burned when there is a substantial amount piled. To burn these trees, the conditions must be right, and a contractor must keep heavy equipment on site during the process per Burning Regulations. Historically, these removal activities have been completed approximately every five years. In addition, the recent replacement of the outlet pipe at Isintok Dam required that the reservoir be drained, which in turn revealed an unexpected amount of wood debris that had become saturated and sank to the bottom of the reservoir. The overall objective of the Isintok Reservoir Deadfall Removal Project is to collect, pile and burn the deadfall within the 'Main Removal Area' of the Isintok Reservoir. The Main Removal Area perimeter is approximately 4.7km with a total reservoir area of approximately 239km2. In addition, the District has also identified an 'Optional Removal Area' within the Isintok reservoir. The Optional Removal Area perimeter is approximately 2.5km with a total reservoir area of approximately 142km2. The District estimates that there may be a window of opportunity to complete this Project once some of the snow is gone and the reservoir surface remains frozen in the spring of 2022. If this window does not present itself, the District will consider lowering the reservoir later in 2022 and removing the trees in early winter, assuming the conditions are right. Further details can be found within the RFP. Term of Engagement: The successful Proponent must be prepared to commence work once the Agreement is fully executed and within one (1) week of receipt of the District's Notice to Proceed. Conditions for Participation and Requirements to Request to Participate: Prospective Proponents must download the RFP documents from the District website and submit a Proposal as per the instructions in the RFP. The Supplier shall provide the District with proof of the following prior to beginning work on this Project: . A Business License that allows the Supplier to perform work in Summerland (either a Summerland Business License or an Inter-Community/Mobile Business License from another Okanagan-Similkameen municipality). . WorkSafe BC Clearance Letter addressed to the District of Summerland, indicating that account is active and in good standing. . Commercial General Liability Insurance coverage in the amount of $5,000,000 as per the requirements detailed in Appendix C - Form of Agreement. . Automobile Liability Insurance coverage in the amount of $5,000,000 as per the requirements detailed in Appendix C - Form of Agreement. . All-Risk Property Insurance coverage as per the requirements detailed in Appendix C - Form of Agreement. . Pollution/Environmental Impairment Liability/Contractor's Pollution Liability Insurance in the amount of $5,000,000 as per the requirements detailed in Appendix C - Form of Agreement. Procurement Method: Request for Proposals. The District reserves the right to negotiate. The District may request a Best and Final Offer (BAFO). Procuring Entity: District of Summerland RFP Contact Person: Carol Madryga, Manager of Procurement & Contract Administration Email: procurement@summerland.ca This procurement may be subject to the Canadian Free Trade Agreement (Chapter Five), and the New West Partnership Trade Agreement.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
18
Bidding Soon
239
All Active Projects
76
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 14, 2022

April 14, 2022

img_map_placeholder

To Be Determined, Summerland, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.