BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Richmond Hill, Georgia. Completed plans call for site work for a 9,500-square-foot playground / park / athletic field; and road / highway.

This is a request for proposals for the installation of a playground with accompanying edging, surfacing and pathway at Boles Park, Parcel #054 009, 5.85 acres belonging to the City of Richmond Hill on Harris trail Rd. Vendors are required to submit written proposals that present the vendor's qualifications and understanding of the work to be performed. The vendors proposal should be prepared simply and economically and should provide all the information it considers pertinent to its qualifications for the Specifications listed herein. Emphasis should be placed on completeness of services offered and clarity of content. The buildable area is behind the existing fountain and pavilion and consists of roughly 9,500 sq feet surrounded by established trees. It is essential that no equipment or associated improvements encroach within the canopy/dripline of any live oaks with the exception of a surfaced pathway from the designated ADA parking to the play area. Product must be durable and be suited for play from large numbers of children of varying ages. Warranty will be an important factor in the acceptance of the winning proposal. No overly complicated mechanical elements which require frequent or expensive repair work will be considered. The park area is surrounded by established and on fairly wet ground for much of the year. Dark colors and elements that help the equipment appear new and clean longer are much appreciated. Power and water are not immediately available on the site and will be the responsibility of the contractor. Contractor must provide with their submittal copies of all applicable insurance and certifications regarding playground equipment installation.

Post-Bid

Playgrounds / Parks / Athletic Fields

$75,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
35
Bidding Soon
363
All Active Projects
182
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2022

April 11, 2022

img_map_placeholder

Harris Trail Rd, Richmond Hill, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.