Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Ardmore, Pennsylvania. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
VIL-1 Villanova: Sidewalk on County Line Road from N Spring Mill Road to Clairemont Road With the 2018 opening of Stoneleigh, pedestrian and vehicular traffic has increased in this area. Since there is no sidewalk along County Line Road between Spring Mill Road and Clairemont Road, residents are forced to walk on County Line Road, a major thoroughfare and one which the Lower Merion Police Department cited for an abundance of speeding issues. This proposed sidewalk on the east side of County Line Road would help connect the community with Stoneleigh, Villanova University, the SEPTA regional rail. and upcoming Villanova Middle School. The proposed sidewalk would be along the following three properties: 1829 County Line Road (Stoneleigh); 1853 County Line Road; and 301 Clairemont Road. The work includes, but is not limited to: tree removal; site clearing; removal and reinstallation of existing fences, statue, and signage; regrading; placement of approximately 1,600 linear feet of 5' wide ADA compliant sidewalk with approximate 4' wide verge; curb replacement; reconstruction of driveway aprons; construction of ADA compliant ramps; new trees and plantings; and restoration. The project will require coordination with Natural Lands, Lower Merlon School District, Villanova University, and adjacent private property owners where the sidewalk is planned. The project also includes the upgrade of the intersection at County Line Road and N Spring Mill Road, which consist of new mast arms, signal, video detection, emergency pre-emption, pedestrian signal heads, and pushbuttons; signing and pavement markings; regrading; replacement and upgrade of the ramps and associated portion of sidewalks to be ADA compliant at three corners (one corner was previously upgraded); and curb replacement. Construction planned for 2023 12024. Please note that the preliminary order of magnitude cost to widen the intersection and provide left turn lanes at each approach would increase the cost shown by an additional $600k to $800k. Project is City of Township of Lower Merion 2022-2027 CIP Page 57 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$880,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
E County Line Rd, Ardmore, PA
Related To This Project
Ardmore, PA
Bid Date: Apr 06 2022
Ardmore, PA
Bid Date: Jan 05 2024
Ardmore, PA
Bid Date: Feb 22 2024
Ardmore, PA
Bid Date: Feb 22 2024
Ardmore, PA
Bid Date: Mar 21 2024
Ardmore, PA
Bid Date: May 09 2024
Ardmore, PA
Bid Date: Sep 22 2023
Ardmore, PA
Bid Date: Oct 10 2018
Ardmore, PA
Bid Date: Aug 31 2023
Ardmore, PA
Bid Date: Feb 22 2024
Ardmore, PA
Bid Date: Jun 09 2023
Ardmore, PA
Bid Date: Jun 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.