BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Pleasant Grove, Utah. Completed plans call for the renovation of a 1,800-square-foot municipal facility.

The City plans to rehabilitate the historic Pleasant Grove Town Hall for use as a museum and gathering space for the City. The Pleasant Grove Town Hall was constructed in 1887 and was built of the native soft rock in the Federal style with Victorian ornamentation. It is a simple rectangular plan with unreinforced stone and adobe walls with a smaller stone addition to the east. The Town Hall was largely renovated in 1961 when it became the Public Library. There were some minor additional alterations in the 1990s as well as a restroom reconfiguration in 2019 in the small room to the east. The Town hall has an approximate area of 1,800 square feet. Priority 1 Scope of Work Removal of existing roofing and replacement with new roofing including: (plywood sheathing, ice/water shield, roofing aper, architectural-grade asphalt shingles, roofing accessories, etc.) Misc. structural upgrade (roof to wall connections) Masonry (mortar repointing, crack repair, water table repair, cleaning, etc. Exterior windows and doors: repair and rehabilitation Wood trim repair (fascia, soffit, cornice, window sills, etc.) Prepping and repainting exterior wood components Priority 2 Scope of Work Selective interior demolition (dropped acoustic ceiling and framing, wall finishes, carpet, etc.) Interior storm windows Refinishing / repair of wood flooring New ceiling gypsum board finishes on the underside of ceiling joists Spray in attic insulation Repair to interior wood wainscoting New lighting New M/E/P Exterior ADA Ramp Porch Restoration Site / Landscape improvements The City may award a contract based solely upon the merits of the initial proposal, without an oral commentary by the proposers. In light of this possibility, proposers should present the most favorable price and service available. If the City deems necessary, a few CM/GC may be selected based on cost, quality and experience to interview and present to the City. The CM/GC selected will be expected to begin work by Wednesday, July 6, 2022. All questions after the Pre-Proposal Meeting must be submitted through electronically.

Post-Bid

Municipal

$530,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
31
Bidding Soon
529
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

July 6, 2022

img_map_placeholder

30 E Center St, Pleasant Grove, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.