BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a pre-engineered storage facility in Portal, North Dakota. Completed plans call for the renovation of a pre-engineered storage facility.

Award Details Contract Award Date: Apr 15, 2022 Contract Award Number: 47PJ0022P0021 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: EB87YJ48NF45 Contractor Awarded Name: Green Cat Services LLC Contractor Awarded Address: Rolla, ND 58367 USA Base and All Options Value (Total Contract Value): $23400.00 NAICS 236220 Replace shingles on the storage garages at the Portal and St. John Land Ports of Entries in North Dakota. Solicitation packages will be made available on March 10th, 2022. Security clearances are required for all workers. Contract performance will be 100 days from notice to proceed. This solicitation is 100% set aside for small business. This solicitation will be made available on SAM.gov. Registration on SAM.GOV is required. Simplified Acquistion PoP: 04/01/2022 - 05/31/2022 In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 2:00 pm local time on the following date and at the following address or by email: cody.lee@gsa.gov: Date: 3/29/2022 Address: 657 2nd Ave N Fargo, ND 58102 (2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers. (3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the office designated for receipt of offers on or before the date established for receipt of offers. Project Summary Replacing shingles on the storage buildings at the Portal and St. John LPOE's. The Contract (1) The Contract consists of the SF1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract. (2) The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in Section II, subject to the terms and conditions set forth in this Contract. Period of Performance (1) Commencement. The Contractor shall commence performance of the Work within 15 days after the Contractor receives the Notice to Proceed (NTP). (2) Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 90 calendar days from issuance of Notice to Proceed (NTP). (3) Contract Completion. The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 10 calendar days of Substantial Completion. Work Conditions/Site Requirements Exterior work I.E. Authorized Representatives (1) This Contract is between the United States of America, acting by and through the Administrator of General Services (GSA), and the Contractor (the Parties). References in this Contract to "the Owner" or "the Government" shall be understood to refer to GSA. The following individual is designated as the only authorized GSA representative under this Contract, unless other warranted contracting officers are designated in writing: GSA Solicitation No. 47PJ0022R0040 Page 7 of 92 Contracting Officer's Information Name: Cody Lee Address: 657 2nd Ave N Fargo, ND 58102 Telephone: 701-566-6124 Email: cody.lee@gsa.gov (2) For the applicable authorities and limitations see Section IV of this Agreement, GSAR 552.236-70 Contract Liquidated Damages Rate In accordance GSAR 552.211-12, Liquidated Damages - Construction, in Section IV of this Agreement, liquidated damages shall be calculated at the rate of $ 0 per calendar day. I.G. Buy American Exceptions For the applicable Buy American clause and any exceptions, see Section IV of this Agreement Estimated Price Range The estimated price range for the Project is between $25,000 and $100,000

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$23,400.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
7
Bidding Soon
42
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 1, 2022

img_map_placeholder

Multiple Locations, Portal, ND

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.