BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Live Oak, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Suwannee Road Name: SR 10 (US 90) Limits: From E of Cr 49 to the Suwannee/columbia Co Line Project(s): 44328315201(*) Federal Aid No: D221059B Project(s): 44328315202 Federal Aid No: D221059B Total Roadway Length: 11.117 Miles Contract Days: 200 Total Bridge Length: 0.000 Miles Total Proposal Length: 11.117 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Automated Machine Guidance (AMG) for milling is required. Railroad insurance is required for this Proposal at time of contract execution. Please see the Specifications Package for more information. The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, traffic signals, highway signing, automated machine guidance and other incidental construction on SR 10/US 90 in Suwannee County from east of CR 49 to the Suwannee/Columbia County line. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 010 Resurfacing SR 10 (US 90)

Award

Roads / Highways

$8,536,881.00

Public - State/Provincial

Paving, Site Work

72

5

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
30
Bidding Soon
415
All Active Projects
159
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

May 30, 2022

img_map_placeholder

FL-10, Live Oak, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.