BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Site work for a water / sewer project in Killeen, Texas. Conceptual plans call for site work for a levee.

Update: https://www.killeentexas.gov/DocumentCenter/View/11201/FY-2025-Adopted-Capital-Improvement-Program-2025-2030-PDF Repair severely damaged concrete channel and improve capacity. Stewart Ditch starts at Warrior Way and discharges into South Nolan Creek. The existing channel can handle only 10-year flow and overflow occurs at larger rain events. The engineering analysis will assess the conditions and determine areas where major repairs are necessary. The analysis will also list improvements to increase flow capacity. There are approximately 88 structures in the subject 100-year floodplain area. More severe and extensive damage will occur in future storm events if repairs are not made. This project is ranked # 1 in Stream Repair and Floodplain Improvements category and 5 overall in all categories in 2012 Drainage Master Plan. Project is included in City of Killeen Fiscal Year 2025-2029 Page no. 72 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Repair severely damaged concrete channel and improve capacity. Stewart ditch starts at Warrior Way and discharges into South Nolan Creek. The existing channel can handle only a 10-year flow and overflow occurs at larger rain events. The engineering analysis will assess the conditions and determine areas where major repairs are necessary. The analysis will also list improvements to increase flow capacity. There are approximately 88 structures in the subject 100-year floodplain area. More severe and extensive damage will occur in future storm events if repairs are not made. This project is ranked # 1 in Stream Repair and Floodplain Improvements category and 5 overall in all categories in 2012 DMP. This project is included in the city's fy 2024-2028 Capital Improvement Program. As of February 15, 2024, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$900,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
63
Bidding Soon
1,801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.