BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a power facility in Worthington, Minnesota. Completed plans call for the construction of a power facility; and for site work for a power facility.

The general nature of the work is described as substation construction that includes new circuit breaker, power transformer, shield mast, buswork, switchgear enclosure, and control panels. Construction items include the concrete, switchgear enclosure construction, conduit, grounding, buswork, circuit breaker installation, cap bank installation, power and control cabling, and related work. Project Completion Date: 11/30/2022

Bid Results

Power Plant

$1,450,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
49
Bidding Soon
460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 28, 2022

Project location map

To Be Determined, Worthington, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.