EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2022 at 8:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Worthington, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Approximate Major Quantities: 3,600 CY Common Excavation; 10,750 SY Furnish & Install Geotextile Fabric Type IV modified; 2,900 CY Drainable Aggregate Base; 1352 SY Mill Bituminous Surface; 2,400 Ton Plant Mixed Bituminous Mix; 2,520 SF 4" and 5" ADA Concrete Walk; 2,530 LF Concrete Curb and Gutter, and 1,600 SY Rapid Stabilization Method BFM. A contractor responding to this solicitation document shall submit to the city a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. The term ''responsible contractor'' as used in this solicitation document means a contractor as defined in Minnesota Statues, section 16C.285, subdivision 3. Any prime contractor or subcontractor that does not meet the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3 or fails to verify that it meets those criteria is not a responsible contractor and is not eligible to be awarded the construction contract for the project or to perform work on the project. A false statement under oath verifying compliance with any of the minimum criteria shall render the prime contractor or subcontractor that makes the false statement ineligible to be awarded a construction contract on the project and may result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement. A prime contractor shall submit to the city upon request copies of the signed verifications of compliance from all subcontractors of any tier pursuant to Minnesota Statues, section 16C.285, subdivision 3, clause 7. The City Council reserves the right to reject any and all bids and to waive irregularities and informalities therein and further reserves the right to award the contract to the best interests of the City.

Post-Bid

Roads / Highways

$310,000.00

Public - City

Paving, Site Work

22

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
9
Bidding Soon
161
All Active Projects
64
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2022

June 10, 2022

img_map_placeholder

Multiple Locations, Worthington, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.