BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Morgan Hill, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project is located at East Dunne Avenue, from lower Thomas Grade to the eastern City limit, Morgan Hill, CA 95037, and the Project's Scope of Work is described as follows, but not limited to: Pavement milling and conform grinding, full depth asphalt concrete (AC) pavement repairs, hot mix AC overlay, AC berm, crack sealing, replacement of all traffic delineation and markings, utility cover adjustments, and all related work on various streets within City limits. Per the 49 CFR 26 and Federal contract requirements, listed in Appendix B, bidders are required to take all necessary and reasonable steps to achieve a DBE goal, which by their scope, intensity, and appropriateness to the objective, could reasonably expected to obtain sufficient DBE participation, even if they were not fully successful. The DBE goal is a percentage of the total contract value that must be performed by certified DBE contractors. The DBE goal for this project is 21%. Time for Final Completion. The Project must be fully completed within 75 calendar days from the start date set forth in the Notice to Proceed.For technical questions, contact the project manager, Yat Cho at 408.310.4641 or email yat.cho@morganhill.ca.gov. License. This Project requires a valid California contractor's license for the following classification(s): A (General Engineering Contractor).

Award

Roads / Highways

$2,153,195.00

Public - City

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
75
Bidding Soon
1,402
All Active Projects
606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

June 1, 2022

img_map_placeholder

E Dunne Ave, Morgan Hill, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.