Published May 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a road / highway in Aurora, Illinois. Conceptual plans call for site work for a road / highway.

Update:https://www.aurora.il.us/files/sharedassets/mainsite/v/1/finance/documents/budget/city-of-aurora-cip-2026-2035.pdf Traffic signal modernization at 12 intersections, ADA improvements at various intersections, and bicycle accommodations from Constitution Drive to Edgelawn Drive. In addition, replacement of the aging traffic signal equipment including cabinets, mast arm poles, and signal heads. Surface Transportation Program federal funds will be administered through the Kane-Kendall Council of Mayors. The estimated construction cost is over $9,500,000 which includes new turn lanes at some sections. Federal participation will be vary from 75% to 80% and in maximum amount depending on the project stage. The Illinois Department of Transportation will front-fund the cost of construction and invoice the city for its share and beyond the federalProject is included in City of Aurora Fiscal Year 2026-2035 Page no 288 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: Traffic signal modernization at 12 intersections, ADA improvements at various intersections, and bicycle accommodations from Constitution Drive to Edgelawn Drive. In addition, replacement of the aging traffic signal equipment including cabinets, mast arm poles, and signal heads. Surface Transportation Program federal funds will be administered through the Kane-Kendall Council of Mayors. The estimated construction cost is over $9,500,000 which includes new turn lanes at some sections. Federal participation will be vary from 75% to 80% and in maximum amount depending on the project stage. The Illinois Department of Transportation will front-fund the cost of construction and invoice the city for its share and beyond the federal maximum participation amount. Project is included in City of Aurora Fiscal Year 2025-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.aurora-il.org/DocumentCenter/View/13219/Capital-Improvements-Plan-2024-2033 Traffic signal modernization at 12 intersections, ADA improvements at various intersections, and bicycle accommodations from Constitution Drive to Edgelawn Drive. In addition, replacement of the aging traffic signal equipment including cabinets, mast arm poles, and signal heads. Surface Transportation Program federal funds will be administered through the KaneKendall Council of Mayors. The estimated construction cost is over $8,000,000 which includes new turn lanes at some sections. Federal participation will be 75% of construction costs up to a maximum of $2,500,000. The Illinois Department of Transportation will front-fund the cost of construction and invoice the city for its 25% share and beyond the federal maximum participation amount. The project may be staged into phases depending on results of additional funding requests. Project is included City of Aurora Fiscal Year 2024-2033 Page no 314 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Traffic signal modernization at 12 intersections, ADA improvements at various intersections, and bicycle accommodations from Constitution Drive to Edgelawn Drive. In addtion, replacement of the aging traffic signal equipment including cabinets, mast arm poles, and signal heads. Surface Transportation Program federal funds will be administered through the Kane-Kendall Council of Mayors. The estimated construction cost is $3,571,000. Federal participation will be 75% of construction costs up to a maximum of $2,500,000. The Illinois Department of Transportation will front-fund the cost of construction and invoice the city for its 25% share and beyond the federal maximum participation amount.*** 2021-2022 carryover request to be submitted *** This project is included in the city's 2022-2031 Capital Improvement Plan (CIP). As of February 28, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$4,350,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
566
Active Projects
376
Bidding Soon
4,652
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

W Galena Blvd, Aurora, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.