EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a water / sewer project in San Lorenzo, California. Completed plans call for the renovation of a water / sewer project.

The project contractor shall furnish all tools, equipment, apparatus, facilities, labor and material necessary to perform and complete in a good and workmanlike manner the construction of the WASHER/COMPACTOR project as shown in the project technical specifications and plans and in accordance with the contract documents within 60 calendar days of the project commencement date specified in the notice to proceed for the project. The project work is generally described as: The removal of two existing grinders and associated appurtenances for the installation of two owner furnished contractor installed washer/compactors with its associated appurtenances for a fully functioning system per the attached plans and specifications cash, cashier s check made payable to the District, certified check made payable to the District, or a bidder s bond. The amount of bidder s security provided must equal at least ten (10) percent of the total of the bid price for the base bid and the additive or deductive items listed in this notice. The successful bidder must submit to the District complete, executed copies of all documents specified in the contract checklist included in Volume 1 of the bid package within ten (10) working days of receiving written notice of award of the project. Bidder s security of any successful bidder that fails to do so will be forfeited to the District. The documents required pursuant to the contract checklist include, but are not limited to, a payment or labor and materials bond in an amount of at least 100 percent of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 3248, and a performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the District. The District reserves the right to reject any and all bids and/or to waive any bid irregularities to the extent permitted by law. If the District elects to award a contract for performance of the project, the contract will be awarded in accordance with California Public Contract Code Section 20803 and other applicable law to the responsible bidder submitting a responsive bid with the lowest total bid price for the base bid and the following additive or deductive alternate items as further described in the bid package Questions regarding the bid package should be directed in writing as soon as possible (but no later than five working days prior to the opening of bids) to: Jimmy Dang, PE, Phone: 510.481.6981, email: jdang@oroloma.org. Where appropriate, the District may respond to such questions by addenda transmitted to all bid package recipients. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder s security, bidders may not withdraw their bid during the 90 day period after the bid opening.

Award

Water / Sewer

$86,700.00

Public - City

Renovation

33

12

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents, Commissioning
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Central Heating Equipment, Heat Exchangers for HVAC
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
90
Bidding Soon
2,011
All Active Projects
838
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 28, 2022

img_map_placeholder

2600 Grant Ave, San Lorenzo, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.