BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in San Lorenzo, California. Completed plans call for the construction of a one-story above grade educational facility; and for site work for a educational facility.

**As of February 04, 2021, project has not been awarded. The Board will determine award on Feb. 16th, 2021.** The work described in this document consists of projects on two separate campuses within the San Lorenzo Unified School District, as shown on the included plans. The work at Arroyo High School will include the construction necessary for the fabrication and installation of 3 new, one-story, modular buildings and foundations as shown on the plans and specifications. The modular buildings include classrooms, restrooms, and a teaching kitchen, along with other support spaces including IT and janitor's rooms. The work at San Lorenzo High School will also include the construction necessary for the fabrication and installation of 3 new, one-story, modular buildings and foundations as shown on the plans and specifications. The modular buildings primarily include classrooms and restrooms, with other support spaces including IT and janitor's rooms. The work at both sites will include the preparation of drawings and specifications to submit to DSA for permitting, along with the associated architectural, structural, plumbing, mechanical and electrical work as indicated on the included Drawings and Specifications. Pursuant to Public Contract Code section 20111.6, only prequalified bidders will be eligible to submit a bid for this Project. Any bid submitted by a bidder who is not prequalified shall be non-responsive and returned unopened to the bidder. A Pre-qualification Packet can be requested by email jedwall@slzusd.org. Packets must be received by the District at least 10 business days prior to the bid opening. Bid Questions Due: 12/15/20. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Starting at Arroyo High School 15701 Lorenzo Ave., San Lorenzo, CA 94580 followed by San Lorenzo High School 50 E. Lewelling Blvd., San Lorenzo, CA 94580.

Award

Educational

$6,561,280.00

Public - City

LEED Certification, New Construction, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
52
Bidding Soon
1,845
All Active Projects
779
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2021

February 15, 2021

img_map_placeholder

Multiple Locations, San Lorenzo, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.