Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Peoria, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The City of Peoria invites qualified professional engineering firms to submit their Statements of Interest and Qualifications for preliminary engineering services (Phase I and Phase II) for the construction of a multiuse path extending the Rock Island Greenway from Park Ave to the existing Riverfront Trail at Spring St. The Rock Island Greenway trail system is a regional network that spans the entire City from south to north and beyond into other communities and is considered a backbone of the non-motorized surface transportation though the area. In 2016 the City received an ITEP grant. The project award extended from Harvard Avenue over War Memorial/US 150 to Park Avenue using the abandoned railroad corridor. In 2020 the City of Peoria received an approximately $750,000 ITEP grant. The 2020 ITEP project will begin where the 2016 ITEP project left off at the Park Avenue crossing. The proposed improvements will end at the existing Riverfront Trail near Spring Street. This project will give the trail system through Peoria greater continuity and will provide users of all ages and abilities greater access to non-motorized transportation for work, school, shopping, and recreational activities throughout the region. The scope of services sought by the City of Peoria shall include the preparation of plans and specifications to Illinois Transportation Enhancement Program (ITEP) and Illinois Department of Transportation (IDOT) Motor Fuel Tax (MFT) standards for the construction of a multiuse path. The proposed project will include a 10-foot-wide bituminous multiuse path in the City of Peoria along the abandoned railroad corridor from Park Ave. north of Rock Island St. to Cornhill Street. The corridor between Cornhill Street and the connection to the Riverfront Trail near Spring Street will be evaluated during preliminary engineering. The project may also include enhanced pedestrian crossing features including crosswalks, signage, and potentially rapid flashing beacons at intersection crossings. The following should also be included in the scope of services: 1. Utility coordination, railroad coordination, and coordination with property owners as needed. 2. Identify, prepare all required documents, and apply for any required state, federal and railroad permits. 3. The project must comply with the ITEP grant requirements. Grant reports and submittals are required as part of this project. Additional work may be needed to identify elements that are grant eligible and/or elements that are not eligible for grant funding for both engineering services and construction. Committee informs highest ranked team and begins negotiations - August 1, 2022 Contract submitted to Council Agenda process - August 9, 2022 City Council Meeting at which Contract is Recommended for Approval - August 23, 2022 The estimated budget for the project including preliminary engineering and construction is $1,000,000.00. The project will be funded with ITEP grant, local MFT, and local funds.
Conceptual
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 26, 2023
Rock Island Greenway, Peoria, IL
Related To This Project
Peoria, IL
Bid Date: Jun 21 2022
Peoria, IL
Bid Date: Apr 28 2022
Peoria, IL
Bid Date: May 03 2022
Peoria, IL
Bid Date: Jul 12 2022
Peoria, IL
Bid Date: Jun 27 2022
Peoria, IL
Bid Date: Jun 28 2022
Peoria, IL
Bid Date: Jun 10 2022
Peoria, IL
Bid Date: Jun 03 2020
Peoria, IL
Bid Date: Jun 09 2022
Peoria, IL
Bid Date: Jun 09 2022
Peoria, IL
Bid Date: May 10 2022
Peoria, IL
Bid Date: Jun 17 2022
Peoria, IL
Bid Date: Jun 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.