BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2022 at 8:00 PM

Updated December 17, 2024

Site work and paving for a mixed-use development in Chisago City, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of April 8, 2022. The Project has not yet been awarded. The Project is scheduled to be awarded on April 26,2022. The work includes the construction of approximately: 3720 SY Reclaim Bituminous Pavement - Full Depth 360 TN Type SP 9.5 Wearing Course Mixture (3,C) 590 TN Type SP 12.5 Wearing Course Mixture (3,C) 180 SF 6" Concrete Pedestrian Ramp 36 SF Sign Panels Type C 950 LF 4" Double Solid Line Multi Comp - Yellow 1900 LF 4" Solid Line Multi Comp - White together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Responsible Contractor Certification. COMPLETION OF WORK: All work under the Contract must be complete by 10/30/2022. A Proposal Bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of City of Chisago City shall accompany each bid. The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.

Award

Roads / Highways

$126,276.00

Public - City

Paving, Site Work

12

18

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
141
Bidding Soon
1,390
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

April 22, 2022

Project location map

Multiple Locations, Chisago City, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.