BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 21, 2023 at 8:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Elgin, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

County Line Road Construction Project. The project is along County Line Road at Elm Creek Crossing and the work will include roadway and drainage improvements. CULVERT STA 18+89.81 NBI 142270AA1545002 CULVERT STA 20+28.08 NBI 142270AA1545501 The Official Bid Form for this Contract will be made available to prospective bidders who have met all prequalification requirements on or before 5:00 PM local time, on September 6, 2023 Prequalification requirements: Be registered with State of Texas, Be fully prequalified by Texas Department of Transportation (TxDOT), Have a bidding capacity per TxDOT prequalification system of $4,000,000 Submit a valid Non-Collusion Affidavit, Debarment Affidavit, and Child Support Statement For questions related to the Declaration contact: Jerome Guerrero HUB Program Specialist Phone: (512) 854-9700 Email: hubstaff@traviscountytx.gov Each bid must be accompanied by a Bid Guaranty consisting of a Bid Bond (on the form provided) in the amount of at least five percent (5%) of the Total Bid Amount. The apparent low bidder shall deliver the original sealed Bid Bond to CTRMA within five (5) calendar days of such notification. WHEREAS, Principal is required to furnish a bond guaranteeing the faithful performance of its obligations under the Contract Documents after Final Acceptance, including payment of claims, subcontractors, suppliers, material, men and mechanics, as a condition to release of the Performance Bond and Payment Bond with respect to the Project by Obligee. An overall combined goal of 20.13% has been established for Historically Underutilized Businesses (HUB) per the Travis County HUB Program The contractor will have one hundred forty-seven (147) working days after the date stated in the written Full Notice to Proceed to achieve full completion of all work. The Authority reserves the right to make changes in the work to complete the contract, as defined in the specifications. Upon execution of the contract, a Partial Notice to Proceed (NTP) may be issued at the sole discretion of the Authority to allow the Contractor to perform such tasks as secure materials on hand, produce shop drawings for approval, etc. No time charges will be incurred until a Full NTP is issued A Full NTP will be issued no later than 180 calendar days after award for the Contractor to begin work. Time charges will begin accruing upon issuance of the Full NTP. Question Deadline 09/05/2023 at 12:00 PM CT

Bid Results

Roads / Highways

$3,090,700.00

Public - State/Provincial

Paving, Site Work

115

19

103

8

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
102
Bidding Soon
2,880
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.