Site work for a water / sewer project in Union City, California. Completed plans call for site work for a water / sewer project.

For furnishing all labor, materials, equipment, and services for the construction of improvements designated as: FORCE MAIN CORROSION REPAIRS PROJECT PHASE 3 The project consists of: Removing and replacing manways and appurtenances of air release valves, blow offs and access manways located along the District s twin force mains Welding new steel components Sandblasting and painting/coating existing and new components Implementing biological control measures/BMPs The successful bidder will have one-hundred and twenty (120) calendar days to complete the Project from the Notice to Proceed. The Engineer s Estimate for this Project is $1,035,000. All bidders making a voluntary site visit shall comply with the current (as of the date of the site visit) Alameda County Health Order update regarding the use of face covering and the minimum six-foot physical distance from others. In addition, all bidders shall review, complete, and acknowledge the District s COVID-19 Visitor Screening Questions and Guidelines, which will be made available to bidders upon scheduling the site visit appointment. The District may utilize a touchless thermometer to confirm bidders do not have a temperature of 100.4 degrees Fahrenheit or higher before allowing entry. Under California Laws and Regulations, the District shall inform all prime contractors of public works, to the extent feasible of relevant public work requirements as listed in Section 00010 of the Contract Documents. All bidders shall consider and incorporate measures to ensure compliance with all applicable state and county health orders, including but not limited to Alameda County Health Order No. 20-14a, as may be updated from time to time (County Health Order), and the Construction Project Safety Protocols in Appendix B to the County Health Order. Among other things, compliance shall include but is not limited to the designation of a site-specific COVID-19 officer or supervisor, daily screening protocols, the implementation of social distancing, the provision of personal protective equipment (PPE) and requirement to wear face coverings, the implementation of cleaning and sanitizing requirements, and posting of signage and notices. For Large Construction Projects, compliance also includes but is not limited to preparation of a new or updated Site-Specific Health and Safety Plan and designation of a site-specific COVID-19 Third-Party Jobsite Safety Accountability Supervisor. Each bid must conform and be responsive to the invitation, the Plans and Specifications, and all documents comprising the Contract Documents. Each bid shall be presented under sealed cover and shall be accompanied by a certified check or bidder's bond, made payable to the District, in an amount not less than ten percent (10%) of the bid. The said check or bidder s bond shall be given as a guarantee that the successful bidder will execute the contract in conformity with the form of agreement contained within the contract documents, and will furnish bonds and insurance policies as specified within ten (10) days after notification of the award of the Contract to the successful bidder. Cost for work described in each addenda issued during the time of bidding shall be included in the Bid and the addenda shall become a part of the Contract documents. Bidders shall develop and submit bids at their own expense. The District will not reimburse any costs associated with the development and submittal of any and all Bids. The District reserves the sole right to reject any and all bids and to waive any informality in a bid. No bidder may withdraw its bid for a period of ninety (90) days after the date set for the opening thereof. At the successful Contractor's option, securities may be substituted for the required retention, in accordance with the provisions of Section 22300 of the State of California Public Contract Code. Deadline for submission of written questions is 12:00:00 pm, Monday, March 14, 2022.

Award

Water / Sewer

$1,063,672.00

Public - City

Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
87
Bidding Soon
1,792
All Active Projects
673
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

May 24, 2022

img_map_placeholder

To Be Determined, Union City, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.