BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2024 at 7:00 PM

Updated August 8, 2024

Site work and paving for a mixed-use development in Santa Clarita, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000341405 Engineer's Estimate: $650,000 License Required: A The project will construct a Class I, shared use trail along the southerly maintenance access road of Bouquet Creek Channel. The trail entrance is 450 feet northeast of Espuella Drive and follows the existing maintenance access road to Central Park. The proposed trail will continue through the park and conclude at Bouquet Canyon Road, adjacent to the west driveway entrance of the park. The alternate trail section commences at the west driveway entrance and exits onto Bouquet Canyon Road by the main park entrance. The total length of both trail sections is approximately 0.8 miles. Improvements include trail construction, AC paving, seal coat, concrete work, fencing and gates, masonry block, grading, signage and striping. Question Acceptance Deadline 02/22/2024 at 11:00 AM PT Questions are submitted online Yes -- Questions shall be submitted and responses provided electronically General Requirements - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Onsite Maintenance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % Contact Information: Mariela Delgado| (661) 286-4066 | mdelgado@santa-clarita.com

Award

Roads / Highways

$672,306.00

Public - City

Paving, Site Work

42

18

8

7

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
598
Active Projects
288
Bidding Soon
3,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

Project location map

Bouquet Canyon Rd, Santa Clarita, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.