EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2022 at 8:00 PM

Updated July 13, 2024

Renovation of a transportation facility in Barnstable, Massachusetts. Completed plans call for the renovation of a transportation facility.

Cape Cod Gateway Airport Operations Modifications and T Hanger project Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Contractor Qualification DCAMM Certificate Estimated Cost $4.8 Million **Sub Bid Deadline 3/23/22 Time 2:00 P.M. Sub Bid Category Masonry, glazing, acoustic tile ceiling, painting, fire protection, tile, plumbing, HVAC and electrical . Project Estimate: $ $4.8 Million The project consists of two phases, combined into a single contract; Phase A: T Hangar Replacement; and Phase B: Airport Operations Modification and Upgrade (ARFF building). The Project includes work related to civil, structural, mechanical, electrical, plumbing, fire protection, and architectural elements. (a) Phase A includes the demolition of the existing T-Hangar Structure located on site and the construction of a new T-Hangar Structure. The building will be one story in height and approximately 8,870 sf in area with six hangar spaces and two storage rooms. The structure will have galvanized steel columns, a concrete slab on grade, corrugated,metal siding, which is classified as Type IIB construction. Each hangar space is served by a bi-folding, motorized hangar door that is approximately 44 ft wide by 14 ft high. The hangar doors are equipped with man doors for egress. The building will be equipped with an automatic sprinkler system, fire alarm system, and fire extinguishers throughout. (b) Phase B project consists of an Alteration of a portion of the existing two story ARFFSRE building. The building is a mixed used 14,544 sf occupancy primarily classified as group B occupancy with space used for air rescue, firefighting and vehicle maintenance operations; The building is sprinklered throughout. The alteration includes selective demolition of a portion of the exterior, and the renovation of the existing operations & lounge room at the northwestern end of the building, the addition an internal vestibule for direct access to the space from the airport ramp DBE (3.7%) Bid Result. General Contractor:TRAC Builders, Inc $5,392,000.00 Electrical:Brite-Lite Electrical Co., Inc. $415,875.00 Fire Protection: Carlysle Engineering Inc. $215,580.00 Glass & Glazing: Kapiloffs Glass INC $142,800.00 HVAC:D.D.S. Industries, Inc. $149,825.00 Masonry:Costa Brothers Masonry, Inc $171,000.00 Painting:keltic painting $26,720.00 Plumbing:Araujo Bros Plumbing, Inc. $137,000.00 Tile: Pavilion Floors, Inc $79,250.00

Award

Transportation Terminals

$6,730,050.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Facility Remediation, Asbestos Remediation
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
109
Bidding Soon
1,886
All Active Projects
775
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

July 20, 2022

img_map_placeholder

480 Barnstable Rd, Barnstable, MA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Airport Operations Modifications and T Hangar project - SUB Bid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.