Published September 21, 2022 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Shawnee, Oklahoma. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A summary of the scope of work for the project include: Headworks facility with screening, grit removal and lift station (x2) 3 cell - 4.5 MGD Sequencing Batch Reactor WWTP 2 cell Aerobic Sludge Digesters w/ digested sludge pump station Ultraviolet Disinfection System in building Non-potable Water System in building High Efficiency Blowers in building Dual Belt Filter Press in building w/ sludge loading Miscellaneous Buildings - Operations / Control / Laboratory Facility / Electrical buildings Effluent Lift Station with Cascade Aeration Concrete lined Flow Equalization Basin w/ return Lift Station (x2) Associated piping, flow measurement and miscellaneous equipment with appurtenances Associated SCADA & Electrical systems with appurtenances Demolition of Existing WWTP (x2) 48,000 of 24 HDPE Forcemain 5,000 of 30 HDPE Forcemain The estimated construction cost of the project is $59,000,000. Funding for this project is provided through a Clean Water State Revolving Fund (CWSRF) Loan (ORF 20-0018-CWA) from the Oklahoma Water Resources Board (OWRB). As such, compliance with the Davis Bacon Act, American Iron and Steel, and Labor Standards Contract Provisions is mandatory. System for Award Management (SAM) registration is required for all contractors. Contractors desiring to submit a bid as a prime contractor for this project MUST submit their qualifications to the Owner and Engineer for approval. Contractors determined by Owner and Engineer to be qualified to perform the Work on the basis of their submitted qualifications will be notified that they have been prequalified for submitting a bid for the construction of the Project. Only prequalified bidders will be permitted to submit Bids for the construction project. Any Bids received from Bidders who were not prequalified will be returned unopened. Plans have been provided and are VERY preliminary in nature and represent only enough information to convey scope. Additionally, not all unit processes have been detailed (i.e. belt filter press.) They are only meant to provide the contractor enough detail to make a decision on potential interest in bidding the project. They are not to be relied up in ANY other manner and the final bidding documents may change significantly. Scope of work to be completed at the Southside WWTP will include construction of a pretreatment facility (headworks with grit removal) with stormwater holding adjacent to the existing treatment plant. The pretreated wastewater will them be pumped through 48,000' of 24" HDPE forcemain to the Northside WWTP for final treatment. Upon completion and startup, the existing Southside facility will be demolished. Scope of work to be completed at the Northside WWTP is the construction of a new 4.5 MGD Sequencing Batch Reactor Wastewater Treatment Plant. The WWTP will be constructed in an area north of the existing Northside WWTP facility. None of the existing Northside WWTP will be utilized and it will be demolished upon completion of the new facility The deadline to ask questions is 7/27/2022 3:00 PM CDT

Award

Water / Sewer

$103,558,730.00

Public - City

Renovation, Site Work

Subscribe For Documents

120 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Existing Products, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Grouting, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roofing and Siding Panels, Metal Roof Panels, Metal Wall Panels
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Electrical Power Monitoring and Control, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Trench Shielding, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Specialty Material Handling Equipment, Lubrication Systems, Manufacturing Equipment, Machining Equipment, Boring Equipment, Drilling Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
50
Bidding Soon
768
All Active Projects
329
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2022

September 26, 2022

img_map_placeholder

Multiple Locations, Shawnee, OK


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.