Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a residential development in Shawnee, Oklahoma. Conceptual plans call for the construction of a residential development; and for site work for a residential development.
The purpose of the project is to develop six to twelve sets of completed single-family residential building plans, stamped by an architect licensed to practice in the State of Oklahoma. These plan sets will be the basis of a residential infill program designed to 1) increase residential infill opportunities, 2) help make such infill projects more compatible with the surrounding neighborhoods, and 3) work to develop additional housing opportunities. Shawnee, Oklahoma, in Pottawatomie County, is directly east of Oklahoma City on Interstate 40. The Shawnee Twin Lakes area is easily accessible via Interstate 40 at Exit 178 / Highway 270 South (Grand Casino). The rest of the community can be accessed via Interstate 40 with exits for US Highway 177, Kickapoo Street, and Oklahoma Highway 18/Harrison Street. The 2021 population estimate was 31,576, according to the US Census. Shawnee is home to Oklahoma Baptist University and also houses the main campus of Gordon Cooper Technology Center. The project is being developed to serve as a means of providing residential infill opportunities that are compatible with the surrounding neighborhood areas to the greatest extent possible. Over the past 20-plus years, several residential structures have reached a state of disrepair and are no longer habitable or need significant repair. In addition, the community has experienced an increase in the number vacant lots in older residential areas. To help address this issue, the City of Shawnee desires to create a housing palette that contains up to 12 completed singlefamily residential building plans that a property owner can use to establish a new dwelling unit in an older, established part of the community. The housing plans created as part of this project will be reviewed by the Citys building inspectors to ensure that, once completed, the building plans are able to be permitted for construction in an accelerated time frame and will allow a property owner to proceed to construction faster than a typical building permit submittal. The City will work with community stakeholders to identify the areas within the City where this group of building plans can be utilized. Specific items to be included within the scope of services are eight to twelve building plans that vary with regard to number of bedrooms, number of bathrooms, and overall size. The City of Shawnee is looking for building plans that range from 1 bedroom/1 bath combination up to a 3 bedroom/2 bathroom combination. Building sizes should range from 900 to 1400 square feet to accommodate setbacks, and each set of building plans should account for parking (via a parking pad, detached garage, or attached garage). The deliverables will be a minimum of eight and a maximum of twelve building plans fully completed and stamped by an architect licensed to practice in Oklahoma. In addition, the consultant will be required to provide one hard copy and one electronic version of a final draft for review purposes. Once approved, the consultant will be required to provide one hard copy and one electronic copy of said plans. The City of Shawnee shall retain ownership of all data generated. Questions regarding the Request for Proposals can be directed to: Mr. Rian Harkins, AICP Community Development Department City of Shawnee 222 N Broadway Shawnee, OK 74074 (405) 878-1665 rian.harkins@shawneeok.org The method of contractor selection has not been determined at this time.
Conceptual
Residential Subdivision
$15,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2023
To Be Determined, Shawnee, OK
Related To This Project
Shawnee, OK
Bid Date: Sep 13 2022
Shawnee, OK
Bid Date: Sep 06 2022
Shawnee, OK
Bid Date: Aug 01 2022
Shawnee, OK
Bid Date: Aug 01 2022
Shawnee, OK
Bid Date: Sep 30 2022
Shawnee, OK
--
Shawnee, OK
Bid Date: Feb 09 2023
Shawnee, OK
Bid Date: Jan 12 2023
Shawnee, OK
Bid Date: Aug 29 2022
Shawnee, OK
Bid Date: Aug 29 2022
Shawnee, OK
Bid Date: Jul 05 2022
Shawnee, OK
Bid Date: Aug 08 2022
Shawnee, OK
Bid Date: Jul 14 2022
Shawnee, OK
Bid Date: Apr 02 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.