BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2023 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a mixed-use development in Bridgewater, Massachusetts. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Plumbing Second Request Trade RFQ Request for Qualifications for Trade Contractors for One (1) Trade Contractor Package: Plumbing - Second Request ($58,000), for Fire Services SE Campus, Site Infrastructure and Burn Building, Bridgewater, MA. This Project is Phase 1 Construction of the Fire Services SE Campus located in Bridgewater, MA. This first phase of a long-term build out will include demolition of existing dormitory buildings, construction of new site utilities and infrastructure, and construction of a new Class A Burn Building Prop. The site is an 18-acre site, currently containing existing buildings and paved areas. The project build area is nine-acres located at the north end of the campus site. This is the first phase of a long-term build out and will include demolition of existing dormitory buildings, construction of new site utilities and infrastructure; and construction of a new Class A Burn Building Prop. Plumbing ($58,000) This is a Construction Management at Risk Project under M.G.L. c. 149A. Interested firms MUST submit a Qualification Statement by the deadline and be prequalified on this Project. DCAMM Certification applies for this Process. This Request for Qualifications is the first part of a two-step process for Trade Contractors. First, interested firms must submit the Qualification Statement. Then, at a later date, only prequalified firms will be invited to submit bids for the category of works in which they were prequalified. This Qualification Statement is different from DCAMM Certification. All firms must be qualified for this project, even if they are already DCAMM Certified Construction of Phase 1 of the Fire Services SE Campus located in Bridgewater, MA. This first phase of a long-term build out will include demolition of existing dormitory buildings, construction of new site utilities and infrastructure, and construction of a new Class A Burn Building Prop

Post-Bid

Fire / Police

$11,450,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
304
Bidding Soon
3,814
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2023

December 1, 2023

Project location map

Multiple Locations, Bridgewater, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.