BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Abingdon, Virginia. Design plans call for site work for a water / sewer project.

As of December 14, 2023, per owner, a design team has been identified. No general contractor selected at this time for construction. Bidding to open in January 2024. Status = PE Phase Completed, Bidding to begin January 2024. Construction to begin Spring 2024. PURPOSE In accordance with the Virginia Public Procurement Act 2.2-4303, the Town of Abingdon (Town) is requesting proposals for to procure engineering services related to sanitary sewer system improvements that are outlined in the Town's Southwest Virginia Pilot Program Phase 1 Sewer System Evaluation Survey (SSES). The Town reserves the right to utilize the selected firm from this RFP process to provide comprehensive services as well as any other engineering services needed to evaluate and improve the sanitary sewer collection and wastewater treatment plant system and any recommendations or needs identified in the on-going SWVA Pilot Program Phase 2 SSES. SCOPE OF WORK The Town seeks professional engineering services for the development of construction documents to meet the recommendations outlined in the Town's most recent I&I and SSES reports. These services may include but are not limited to sewer mapping, flow monitoring, sanitary sewer modeling, future flow projections, alternatives analysis, Manhole Assessment and Certification Program (MACP) and Pipeline Assessment and Certification Program (PACP), certified inspections of manholes and/or pipes, smoke testing, pump station assessments, preliminary engineering report development, capital improvements plan development, design, project management, funding coordination, phase planning, survey and easement acquisition, permitting, bidding assistance, construction administration, and construction inspection. FIRM SELECTION SCHEDULE The Town would like to complete the selection process and have a contract with the selected firm in March 2022 with the first Task Order issued by early April 2022.

Design

Water / Sewer

$2,600,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
82
Bidding Soon
851
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

Project location map

Multiple Locations, Abingdon, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.