Demolition, site work and addition to a library in San Diego, California. Working plans call for the addition of a library; for the demolition of a library; and for site work for a library.

The owner has selected a Construction Manager. The County of San Diego (County) is requesting proposals (Proposal) from firms qualified to provide Construction Manager at Risk services for the preconstruction and construction phases of the Julian and Rancho San Diego Libraries Expansion. The delivery method for this Project is "Construction Manager at Risk" (CMAR), and will consist of a preconstruction phase and, at County's option, a construction phase. During the preconstruction phase, the CMAR will collaborate with the County and Architect/Engineer on existing conditions, design, constructability, cost, and schedule of the Project and develop a Guaranteed Maximum Price (GMP) for the construction phase of the Project. Upon County acceptance of the GMP, the County may exercise its option for the construction phase. If the County and the CMAR do not agree upon a GMP, the County will not exercise its option for the construction phase of the Project to the CMAR. Please note that the Architect/Engineer team will provide two separate sets of construction documents, one for the Julian Library Expansion and one for the Rancho San Diego Library Expansion, and that this single solicitation will result in two concurrent but separate contracts, one for each library. This is needed to properly track invoicing and funding, as well as individual project schedule. The budget not to exceed for the Julian Library Expansion project is $4,000,000.00 which includes a $250,000 FF&E allowance, and the budget not to exceed for the Rancho San Diego Library Expansion project is $850,000.00 which includes a $75,000 FF&E allowance. Separate Price Proposal forms will be provided. Questions due March 25, 2022 prior to 5:00 p.m. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1850 HIGHWAY 78, JULIAN, CA 92036

Pre-Construction/Negotiated

Library

$4,850,000.00

Public - County

Addition, Demolition, Site Work

188

6

8

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

August 15, 2022

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.