BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Spanish Fork, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

PROJECT NO. 1210608 The Work includes the construction of a new 3 MG AWWA D110, Type 1, prestressed concrete reservoir; reservoir inlet, outlet, underdrain, drain, overflow, and washdown piping; connections to existing yard piping; temporary piping, electrical and SCADA connections during construction; landscaping, restoration and irrigation; electrical, instrumentation and controls; testing, disinfection, commissioning and startup. Work includes mechanical improvements to the existing Outlet Valve Vault; excavation, backfill, earthwork; asphalt access roads and asphalt restoration associated with construction of new facilities; and all other work required to complete this project as defined in the drawings and specifications. Only the Prequalified General Contractors from the City's Statement of Qualifications Pool are allowed to submit a bid to this request. Bonding Range for this project is $4,700,000 to $5,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Time is of the essence. The Work must be completed within 548 calendar days after the commencement date stated in the Notice to Proceed If the bid is awarded as the winning bid, the bidder will promptly obtain the required bonds and insurance and will prepare the required submittal documents and execute the Contract All communications relative to this Work shall be directed to the Purchasing Manager, joe.bryant@westjordan.utah.gov until a contract has been awarded and executed by the City. All questions relating to the interpretation of the Contract Documents or products or any requirements for submission must be submitted in writing at least 7 days prior to the opening of bids Any responses by the City, if any, will be in the form of a written addendum or clarification. The City is not required to respond to any questions submitted by bidders and will not be liable for any result of such action or inaction of the City. September 4, 2023: Substantial completion of new Zone 6 Highway Junction Reservoir 2 construction. October 19, 2023: Final completion of all Work. Engineer or designated representative, acting for Owner, reserves the right at all times and places to reject any articles or materials furnished hereunder which, in any respect, fail to meet the requirements of the Contract Documents, regardless of whether the defects in such articles or materials are detected at the point of manufacture or after completion of the Work at the Site. Question Submission Close Date 3/14/2022 10:00 AM MDT

Award

Roads / Highways

$7,849,000.00

Public - City

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
29
Bidding Soon
482
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.