EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Danville, Illinois. Completed plans call for the renovation of a 26,685-square-foot, one-story above grade laboratory facility.

Contract Award Date: Nov 21, 2022 Contract Award Number: 36C25223C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: M1MTVBF5ZNY6 Contractor Awarded Name: BRIDGER NATIONAL CONSTRUCTION LLC Contractor Awarded Address: CHICAGO, IL 60646 Base and All Options Value (Total Contract Value): $5191181.00000000 Project 550-20-110 Renovate Lab and Pathology B58-1 at the VA Illiana Health Care System, Danville, IL 61832. Contractor shall furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract, in accordance with specifications & drawings to complete Project 550-20-110 Renovate Lab and Pathology B58-1 at the VA Illiana Health Care System, Danville, IL 61832. All Work shall be completed within Three Hundred Sixty Five (365) calendar days after issuance of the Notice to Proceed (NTP). Project Magnitude Range: $5,000,000.00 and $10,000,000.00 NAICS Code is 236220, Commercial and Institutional Building Construction / SBA Size Standard: $39.5M This procurement is a 100% set-aside for CVE Verified Service-Disabled Veteran-Owned Small Business Firms (SDVOSB) per The authority 38 U.S.C 8127 (Public Law 109-461). In accordance with VAAR 819.7003(b), at the time of the submission of Bid, and prior to award of any contract, the bidder must represent to the CO that it is: (1) a SDVOSB eligible under VAAR Subpart 819-70: (2) a Small Business concern under the NAICS assigned to this acquisition; and (3) a SDVOSB listed as verified in the VIP database Submit all questions regarding the solicitation, specifications, and/or drawings in writing to the Primary POC: Thomas Stevens - Contract Specialist, no later than 1:00 PM local time on September 15, 2022. Questions received after this deadline may not be addressed. TELEPHONE INQUIRIES WILL NOT BE ACCEPTED. See 52.236-27 Site Visit for information on organized site visits: One site visit is scheduled for September 08, 2022 from 10:00 -11:00 AM. Meet at Bldg. 58-1 Lab and Pathology at the VA Illiana Health Care System, Danville, IL 61832. NOTICE: VA and/or a third party (support contractor) will require access to VA contractor records to assess contract compliance with the limitations on subcontracting requirements included in FAR 52.219-14. See LIMITATIONS ON SUBCONTRACTING AND COMPLIANCE. 4.11 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION. Please see this section to fill out the required information. If submitting as a joint-venture, officers must include a copy of the joint-venture agreement. All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: SOLICITATION: PROJECT: 36C25222B0033 550-20-110 (Construction) Renovate Lab and Pathology B58-1 The contractor shall provide for and furnish all labor, supervision, materials, tools, equipment, licenses, certification, insurance and temporary protection to Renovate Lab and Pathology B58- 1 as required by the drawings and specifications and other terms and conditions as applicable. Provide work in accordance with federal, state, and local authorities as detailed in the attached project scope of work, specifications and drawings at the VA Illiana Health Care System, Danville, IL 61832. All work shall be completed within 365 calendar days after receipt of the Notice to Proceed. A. Base Bid: Furnish all labor, materials, equipment, tools, supervision, and all othernecessary resources required for Project #550-20-110 "Renovate Lab and PathologyB58-1" as required the drawings and specifications. Work includes general construction, alterations, walks, grading, drainage, necessary removal of existing structures and construction and certain other items. All work shown on the accompanying Construction Plans is included in the base bid. This includes workat Building 58. PERFORMANCE PERIOD: 365 DAYS AFTER RECEIPT OF NOTICE TO PROCEEED. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Laboratories

$5,191,181.00

Public - Federal

Renovation

121

29

38

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Field Samples, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Spare Parts, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Post-Tensioned Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Millwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Glazing Accessories
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Paver Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Resilient Sheet Flooring, Resilient Tile Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Refrigerated Display Equipment, Office Equipment, Printers, Foodservice Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Cooling Equipment, Packaged Water Chillers, Central HVAC Equipment, Packaged Outdoor HVAC Equipment, Packaged, Outdoor, Central-Station Air-Handling Units, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Transient Voltage Suppression, Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Structured Cabling, Communications Horizontal Cabling, Data Communications, Data Communications Peripheral Data Equipment, Printers, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Healthcare Communications and Monitoring Systems, Nurse Call/Code Blue Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Backfill, Compaction, Earthwork Methods, Slope Protection, Containment Barriers, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
37
Bidding Soon
727
All Active Projects
356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

December 12, 2022

img_map_placeholder

1900 E Main St, Danville, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Renovate Lab and Pathology B58

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.