Published May 11, 2022 at 8:00 PM

Updated January 25, 2024

Demolition, site work, new construction and addition to a pre-engineered storage facility in Cascade Locks, Oregon. Completed plans call for the addition of a pre-engineered storage facility; for the demolition of a pre-engineered storage facility; for the construction of a 7,830-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The Project consists of constructing: an approximately 7,830 s.f., one-story, pre-engineered metal building expansion to an existing PEMB with plumbing, mechanical, electrical, fire alarm and fire suppression systems. Exterior site improvements to include curb, sidewalk, and utilities, along with all restoration and appurtenances necessary to provide a complete and functioning project. The Engineers Estimate for the Project is between $750,000 and $1,000,000. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form. Upon Issuing Office's receipt of payment, printed Bidding Documents will be reproduced within 24 hours and sent via the prospective Bidder's delivery method of choice; the shipping charge will depend on the shipping method chosen. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Owner it is in the public interest to do so. The Owner also reserves the right to waive any informality in connection with said bid or to postpone the award of the Contract(s) for sixty days. Each bid must contain a statement as to whether the Bidder is a resident bidder as defined by ORS 279A.120. Award of the Project will be contingent upon funding. The Notice of Intent to Award shall be issued via facsimile or electronic data exchange to all bidders. All Bidders must submit, in a separate sealed envelope, disclosure of first-tier subcontractors by 4:00 p.m., local time, April 5, 2022, as required by ORS 279C.370. Attention is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract(s). This public works project is subject to the Oregon Prevailing Wage Rate laws. No bid will be received or considered by the Owner unless the bid contains a statement by the Bidder as part of their bid that provisions of ORS 279C.800 through .870 (Oregon Prevailing Wage Law) will be complied with and the Bidder is registered with the Construction Contractors Board as required by ORS 701. This Project does not involve asbestos removal.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$1,075,003.00

Public - City

Addition, Demolition, New Construction, Site Work

134

31

4

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Siding, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Air-to-Air Energy Recovery Equipment, Packaged Air-to-Air Energy-Recovery Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Retaining Walls
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
32
Bidding Soon
592
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

June 6, 2022

img_map_placeholder

1425 Columbia Gorge Wy, Cascade Locks, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.