BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Huntington, New York. Completed plans call for the renovation of a municipal facility.

(Replace cabinets and counters). The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 21 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: Existing floor is to be protected from damage. Remove and discard cabinets, counter tops, sink, and faucet in kitchen. Remove and reinstall all existing appliances, to new work. Provide and install new Corian counter tops and matching full height back splash. Counter tops to have 1/2 bullnose edge and 1/2 " radius corners. Color to be Maui. Temporary tops are to installed until permeant counter tops are installed. Supply and install new kitchen cabinets, upper and lower, with (Kraftmaid Shaker Style, Sonora Cherry in Cinnamon, model #RDCDS.HD,SNC4,CAC) to match existing sizes in place or equivalent substitutions of materials allowed, must meet or exceed requested, prior approval required. Supply and install a new 10" deep single bowl stainless steel sink, new single lever Delta Classic kitchen faucet with sprayer, new supply valves, new stainless steel braided supply lines, new sink strainer, new trap and wastes lines connect to existing plumbing. Caulk all areas where needed with a pure silicone sealant (color matching). Contractor shall provide any patching and painting (color to match existing) repairs needed resulting from project work. All work to meet currant NYS codes and regulations. Contractor is responsible for all third party testing and certificates if necessary. GENERAL REQUIREMENTS: Bid price is to include all materials, labor, disposal of materials, fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. Work is to be done between the hours of 8:00am and 5:00pm , Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. Lawn Damage/Property Damage If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn. Personal vehicles are not to be parked on the grass. Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job. Continuity of Work/Communication/Scheduling Once the job has begun, it is to be worked on continuously until completed. If there are any delays, even if due to inclement weather, a Work Control Representative MUST be contacted. Work must be completed within 21 days of receiving the purchase order. House Safety The residence will be occupied during the job. The contractor must take all reasonable care to safeguard the residents and the staff. The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday. Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day. The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed Service-Disabled Veteran-Owned Set Aside: No

Post-Bid

Municipal

$50,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
764
Active Projects
440
Bidding Soon
6,669
All Active Projects
2,578
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2022

May 11, 2022

img_map_placeholder

115 Manor Rd, Huntington, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.