BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a municipal facility in Toronto, Ontario. Completed plans call for the renovation of a municipal facility.

1- Existing Roofs - Buildings 300 and 75: The existing roofs of the two buildings are being replaced, as they are original construction, and have reached the end of their functional lives. The Architectural portion of the project involves the replacement of the roofing materials (membranes and insulation) with modern, state of the industry materials and methods, to restore the water tightness of the systems. In addition, the roofing work will support the reconfiguration of the ventilation system in Building 300, by closing off a number of existing roof openings and the provision of new fan openings. 2- Existing Exhaust Fans (Eq. No's TS-DUF-TRB-EF-001 and TS-DUF-TRB-EF-002): The existing exhaust fans that ventilate the Tipping Floor are slated for removal because of their age and the accompanying concerns over their reliability. The mechanical portion of the project seeks to replace these fans with the optimal technological solution considering current standards and codes and the present condition and use of the Tipping Floor as these have changed since the existing fans were installed. 3- Electrical Power & Control Upgrades for HVAC Modifications: The roof replacement at Building 300 requires the replacement of two (2) existing exhaust fans with six (6) new roof top exhaust fans and two (2) new side wall supply fans. The electrical portion of this project involves the decommissioning of the existing fans power and controls accompanied by the corresponding provision of power and controls for the eight (8) new units. Documents can be obtained at: http://discovery.ariba.com/rfx/12471052 Owner does not track plan takers and/or interested bidders. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at research.canada@constructconnect.com Contract Award Value: $2,210,257 net of all applicable taxes and charges $2,497,590 including HST and all applicable charges $2,249,157 net of HST recoveries Contract is expected to start on date of award and end on July 31, 2023.

Award

Municipal

$1,931,585.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
4
Bidding Soon
2,459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

July 6, 2022

Project location map

35 Vanley Crescent, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.