EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Naperville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.

The City of Naperville is accepting bids from qualified vendors to provide all labor, material and supplies associated with the 2022 Street Resurfacing Program - MFT. This is an annual program which rehabilitates existing streets resurfacing the existing pavement. Methods generally include grinding and overlay, curb repair or replacement, and pavement replacement as warranted All questions concerning this bid shall be submitted in writing at least five business days prior to the bid opening to Joe Catalano at catalanoj@naperville.il.us. Execution of a performance bond and labor and materials bond: when noted in the specifications, the city reserves the right to require the successful bidder to supply a performance bond and a labor and materials bond within ten (10) calendar days of acceptance of the bidder's proposal by the city. The bonds, unless otherwise specified by the purchasing manager, shall be 100% of the total contract price. When a bid deposit is required as indicated on the invitation to bid, each bid must be accompanied by either a bid bond signed by a surety company authorized to do business in illinois, a cashier's check or a certified check. For construction projects the bid deposit shall be in an amount equal to at least 5% of the amount of the bid. Any bid deposit shall be in an amount equal as indicated in the invitation to bid. When bids are awarded, the purchasing manager will return all checks except those of the successful bidder(s). The check(s) of the successful bidder will be returned upon the submission within ten (10) days of a properly executed performance bond. If no performance bond is required, the certified check will be returned. Failures of a Contractor to deliver within the time specified, or within a reasonable time as interpreted by the Purchasing Manager, or failure to make replacement of rejected articles when so requested, immediately or as directed by the Purchasing Manager, shall constitute authority for the Purchasing Manager to purchase in the open market articles of comparable grade to replace the articles rejected or not delivered. On all such purchases, either: (1) the Contractor shall reimburse the City, within a reasonable time specified by the Purchasing Manager, for any expense incurred in excess of contract prices; or (2) the City may deduct such amount from monies owed the defaulting Contractor. Such purchases shall be deducted from contract quantities. Should public necessity demand it, the City reserves the right to use or consume articles delivered which are substandard in quality, subject to an adjustment in price to be determined by the Purchasing Manager.

Bid Results

Roads / Highways

$4,973,249.00

Public - City

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Temporary Construction, Temporary Ramps, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
166
Bidding Soon
2,249
All Active Projects
1,050
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2022

June 6, 2022

img_map_placeholder

Multiple Locations, Naperville, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Street Resurfacing Program - MFT

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.