Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and renovation of a civil project in Springdale, Arkansas. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.
As of November 22, 2022, the project has been awarded. A timeline for construction has not been confirmed. The Project consists of the following: A. The completed Work will provide Owner with various wastewater treatment plant improvements. More specifically, the Project includes, but is not limited to, construction of the following: 1. Influent Pumping Improvements a. Construct Peak Flow Pump Station with firm capacity of 30.5 MGD. b. Install new parallel peak flow forcemain. c. Piping modifications within existing influent pump station. d. Construct a new influent splitter structure. e. Replace existing 16" design flow force main with new 36" forcemain. 2. Final Clarifier Improvements a. Install 2 new 150-foot diameter final clarifiers to increase peak flow capacity of final clarifiers from 31.7 MGD to 40 MGD, with site layout provisions to accommodate a third new 150' final clarifier increasing final clarifier capacity to 50 MGD in future phase. b. Install new mixed liquor splitter box to accommodate 3 new final clarifiers. c. Rehabilitate 4 existing 120' diameter final clarifiers with new mechanisms and concrete repair. d. Construct new final secondary effluent junction box. 3. RAS/WAS Pump Station a. Construct new RAS/WAS pumping facilities to support 3 new final clarifiers, complete with new electrical room, control, and bridge crane. b. Modifications to existing RAS booster station piping. 4. Plant non potable water filter facility a. Construct new non-potable water filter building and facilities, complete with new building, filter equipment, process piping and valves, electrical improvements, and yard piping connections. 5. New effluent flume a. Construct new effluent flume, complete with new flume structure and channel, flume equipment, process piping and valves, electrical improvements, yard piping connections, and effluent retaining/headwall. 6. Site improvements to support items above include new yard piping, new paving, grading, and stormwater infrastructure. 7. Site Electrical improvements to support items above include new and relocation of medium voltage electrical conductor duct banks and service, plant controls communications, and low voltage ductbanks improvements. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Award
Water / Sewer
$51,393,794.00
Public - City
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2022
August 8, 2022
To Be Determined, Springdale, AR
Related To This Project
Springdale, AR
Bid Date: Dec 06 2022
Springdale, AR
--
Springdale, AR
--
Springdale, AR
Bid Date: Apr 08 2022
Springdale, AR
Bid Date: Apr 12 2022
Springdale, AR
Bid Date: Apr 26 2022
Springdale, AR
Bid Date: Apr 26 2022
Springdale, AR
Bid Date: Apr 06 2022
Springdale, AR
--
Springdale, AR
Bid Date: Nov 15 2022
Springdale, AR
--
Springdale, AR
Bid Date: Nov 09 2022
Springdale, AR
Bid Date: Jun 03 2021
Springdale, AR
--
Springdale, AR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.