BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000219147 Source ID PU.MU.MB.559625.C105181 Bid Intent Not Available D4. SCOPE OF SERVICES D4.1 The Services required under this Contract shall consist of a benefit analysis and feasibility study of EVP for the City of Winnipeg. The objective is to provide decision makers with a basis on which to assess transportation implications of city-wide EVP implementation and the benefits it may provide. (a) Describe the existing WFPS system for route selection and assess WFPS experience with existing hardwired fire hall pre-emption systems in Winnipeg. (b) Using different types of roadway classifications estimate the number of active emergency vehicles expected per day and quantify the anticipated impacts to traffic including traffic signal coordination recovery time and queue recovery time. (c) Quantify the time-savings achievable for the WFPS through EVP in Winnipeg. (d) Compile and assess intersection collisions involving emergency vehicles over the past five years. Estimate potential changes in collision frequency with EVP and potential cost savings. (e) Determine if EVP should be implemented at all signal-controlled intersections or is there a hierarchy of priority locations that EVP would be more suited for. (f) Research other similar cities with EVP systems and the benefits and lessons learned from those implementations. Include a survey of the type of EVP system used, policies for truncating traffic signal phases and pedestrian clearance times. Summarize which vehicle types are using EVP. (g) Provide overview of off-the-shelf EVP solutions that are compatible with the City's current traffic controllers and Signals Traffic Management System (Transparity) software. Include a Class 4 cost estimate for installation per intersection and per emergency vehicle. (h) Provide a cost-benefit analysis for the installation and incorporation of EVP in Winnipeg based on the findings of this study. This should include factors such as collision reduction, time-savings, traffic impacts, EVP system costs, WFPS facility location requirements, and other factors as determined by the study. D4.1.1 The Services required under D4.1 shall be in accordance with the City's Project Management Manual and templates . Notwithstanding the foregoing, the Consultant is being engaged by the City for its professional expertise; the Consultant shall bring to the Project Manager's attention any aspect of the City's Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice. D4.2 Throughout the Project, the Consultant should coordinate with the City's Project Manager. The City's Project Manager will be: (a) Kept informed by the Consultant's Project Manager of progress on a regular basis. (i) Monthly progress meetings will be held. (ii) The Consultant should distribute agendas one (1) week in advance and minutes one (1) week after each progress meeting. (b) Copied on all Project correspondence. (c) Advised of significant problems/issues as they arise, resolution options to be considered, and recommended solutions for consideration and approval by the City prior to implementation. (d) Involved in any meetings with stakeholders, based on the City's Project Manager's availability. (e) Advised of any potentially controversial issues as they arise. (f) Advised of any additional work considered, prior to it being completed, beyond the original scope of services. (g) Consulted prior to any changes being made to the City approved project schedule. The City's Project Manager shall confirm any schedule changes in writing. The City will establish a Technical Working Group comprised of Winnipeg Fire & Paramedic Services, D4.3 Traffic Signals Branch, and Innovation & Technology staff. Throughout the Project, with the City of Winnipeg's Technical Working Group. D4.3.1 The City is anticipating an active and involved Technical Working Group for this Project. D4.3.2 The personnel assigned to the City's Technical Working Group will be determined at project kickoff. D4.3.3 The City's Technical Working Group will be involved in the day-to-day technical aspects of the Project, specific to their respective disciplines, level of commitment, and availability. They will be engaged and kept informed of the Project's progress through: (a) Monthly Technical Working Group meetings to be organized by the consultant and to be held for the duration of the project. (i) The Consultant should distribute agendas one (1) week in advance and minutes one (1) week after each Technical Working Group meeting. (b) Circulation of Project documentation for review. (c) Additional consultation and collaboration as needed. D4.4 The Consultant should submit a draft final report to the City by August 12, 2022, for review. (a) The draft report should include the results of all items pertaining to D4.1, as described above. (b) The City will complete the review and return the draft final report with comments by September 9, 2022. D4.5 The Consultant should submit a final report for review and approval by the City by September 30, 2022, for review and approval. (a) The final report should include the results of all items pertaining to D4.1, as described above. (b) Allow suitable time for City review, comments, and approval of the final report. The method of Contractor Selection has not been Determined at this time. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
49
Bidding Soon
527
All Active Projects
229
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 9, 2022

September 30, 2022

img_map_placeholder

Multiple Locations, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.