BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a religious / funeral development in Romulus, New York. Completed plans call for site work for a religious / funeral development.

CR Number: 2084455 Seneca County Board of Supervisors will receive sealed bids for the Sampson Veterans Memorial Cemetery: Columbarium Project A. The work shall be done under one Contract including: 1. General Construction / Site Work (Demolition, Improvements, and Restoration Site Work) B. The Contractor is to furnish all labor and materials for the satisfactory completion of all work whether shown or implied in the Construction Documents. C. All debris shall be removed daily from the building under construction, and the area shall be broom cleaned. E. The Prime Contractor shall provide all necessary measures to protect health, welfare, and safety of the general public, to prevent accidents, to avoid unnecessary hazards and to protect the property to which the work under this contract pertains at all times during the duration of the contract period. F. 1. General Construction Work (as defined in the Construction Documents) a. Site Work (Demolition, Utilities, Improvements, Restoration & Cleaning) A. The General Contractor shall provide all temporary, partitions, lifts, scaffolding, barricades, construction stairs, construction office, storage shed for tools and equipment, outdoor toilet facilities and any other provisions necessary for the safe and expeditious process of the work. B. The Contractor shall provide all necessary temporary utilities to complete the work at no additional cost to the Owner. 1. The General Contractor has the responsibility for providing temporary light and power to the site, suitable for supplying electrical energy for illumination and for operation of electrical equipment. 2. Temporary light and power must be completely installed and operating at the earliest possible date, by the General Contractor. 3. The General Contractor shall pay all costs therefore, including costs, fees, permits, etc., for electricity used during construction. C. The General Contractor shall observe the following specific requirements: 1. Bulk storage of gasoline, fuel oil paints and solvents should be kept outside the building. 2. Temporary heating devices and fuel storage shall be approved by the Architect and the Owner in writing prior to its use. Temporary heat shall be provided for this project and shall be at no additional cost to the Owner. 3. Portable fire extinguishers shall be readily available at the site. 4. No on-site burning shall be permitted. 5. Noise, odor and fumes shall be strictly controlled at all times. The Architect and Owner shall be notified at least four days in advance of any work which may involve harmful fumes or excessive odor or noise. D. Sanitary Regulations: 1. The Contractor shall prohibit and prevent the committing of a nuisance on the site of the work or adjoining property and shall discharge any employee who violates this rule. Toilet facilities shall be maintained in strict accordance with the law. The Contractor is responsible for maintaining the toilet facilities in a clean and sanitary manner. E. Plumbing and Bailing: 1. From the commencement to the completion of the building operations, the Contractor shall keep all parts of the site and surrounding buildings free from accumulation of water, no matter what the source or cause of water, and to this end, shall supply, maintain, and operate all plumbing and bailing equipment such as, containers, hose, piping, strainers, fuel, power, etc. F. Appearance of Job Site: 1. Responsibility of removing all rubbish and debris including that left by all trades shall be the sole responsibility of the Contractor as part of the Base Bid. The Contractor shall be responsible for general appearance and clearing off of the site. The Contractor shall provide adequate receptacles in all locations and shall make daily disposal of all rubbish and discarded materials. H. The Contractors shall maintain grounds around the building as found. Damage to the site caused by vehicular traffic or other shall be repaired by the Contractor at no expense to the Owner. The Seneca County Board of Supervisors reserves the right to reject any and/or all bids or any and all items on bid. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0%

Bid Results

Religious / Funeral

$658,000.00

Public - State/Provincial

Site Work

16

15

3

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
67
Bidding Soon
947
All Active Projects
511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2022

April 27, 2022

img_map_placeholder

6632 NY-96A, Romulus, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.