Published December 5, 2022 at 7:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a mixed-use development in Elizabethtown, Pennsylvania. Completed plans call for site work for a water / sewer project; for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and sidewalk / parking lot.

As of December 5, 2022, outfall line construction has started, however, the station itself has not due to supply issues. In general, the work consists of, but is not limited to, furnishing all labor, materials, equipment and incidentals required for the expansion of the existing 800 gallon-per-minute (gpm) buried, packaged pumping station to a 1735 gpm submersible sewage pumping station and install approximately 9,300 LF of 12" force main in parallel to the existing 10" force main. Work includes the installation of three (3) submersible sewage pumps, piping and appurtenances, control system, variable speed pump motor controllers, new channel grinder, a 12-ft x 12-ft precast wet well, precast concrete valve vault and meter pit, temporary electrical connections, a new electrical service entrance, construction of a 22' x 23' masonry building to house electrical gear and a 250 kw emergency generator, HVAC equipment, precast manhole structures and yard piping, site paving, fencing, and grading; demolition of all existing pumping station facilities, and the maintenance of sanitary sewer flows. Four contracts will be issued for the project: General, Electrical, HVAC, and Force Main. CLARIFICATION DEADLINE 4/8/2022 11:00 AM BID TYPE Fixed Fee Contract Contract No. 4 - Force Main Location: The project site is located in West Donegal Township, Lancaster County, Pennsylvania, within and along the roadways of Miller Road, Bainbridge Road (S.R. 2001), and Amosite Road from the existing Miller Road pumping station to the Elizabethtown Sewage Treatment Plant. Description of Work: In general, the work consists of, but is not limited to, furnishing all labor, materials, equipment and incidentals required to construct a 12-inch diameter force main in parallel to the existing 10-inch sewage force main. Work will include tying the existing force main in with the proposed 12-inch line; polyethylene wrapping as necessary to provide external corrosion resistance of the force main; excavation and steel casing as it pertains to the placement of the 12-inch force main; installation of air release valves and vaults; site restoration; testing of the new 12-inch force main, and the maintenance of sanitary sewer flows. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Water / Sewer

$2,071,083.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

157 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Special Foundation and Load Bearing Elements Instrumentation and Monitoring, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Roadway Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
133
Bidding Soon
1,973
All Active Projects
967
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

September 19, 2022

img_map_placeholder

470 Miller Rd, Elizabethtown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Miller Road Sewage Pumping Station Expansion - Contract No. 4 - Force Main

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.