Renovation of a mixed-use development in Vincennes, Indiana. Completed plans call for the renovation of a educational facility; and laboratory facility.

The Owner reserves the right to accept or reject any bid or waive any informality or errors in bidding. Method of Bidding: Contract #1: General Construction, Contract #2: Mechanical Construction, Contract #3: Electrical Construction. Preparation and Submission of Bids: Bids shall be executed in accordance with the provided bid forms, Certification of NonSegregated Facilities and with Indiana State Board of Accounts Form 96 (revised 2013), a completed AIA Form G705 must be included stating. Contractor shall acknowledge all addenda on bid form. Withdrawal of Bid: Should bidder withdraw his bid within 90 days date of opening without written consent of the Owner, the Owner may declare the bid deposit forfeited as liquidated damages. Plans and Specifications: Performance of the work shall be in accordance with plans and specifications on file at the following locations OFFICE OF ARCHITECTURAL SERVICES & FACILITIES ARCHITECT/ENGINEER Andrew Young, AIA, LEED AP Joe Briggs, Architect University Architect and Director Gibraltar Design Vincennes University 9102 North Meridian Street, Suite 300 817 N. Second Street Indianapolis, Indiana 46260 Vincennes, IN 47591 GROUP BUILDERS EXCHANGE OF LOUISVILLE Document Processing Center 2300 Meadow Drive 30 Technology Parkway South, Suite 100 Louisville, KY 40218 Norcross, GA 30092-2925 DATA AND ANALYTICS CONSTRUCTCONNECT Midwest Region 3825 Edwards Road, Suite 800 7265 Kenwood Road, Suite 201 Cincinnati, OH 45209 Cincinnati, OH 45236 BIDTOOL BX INDIANA/CONSTRUCTION LEAGUE One Oakbrook Terrace Suite 510 1200 South Madison Avenue, Suite LL20 OakBrook Terrace, IL 60181 Indianapolis, IN 46225 Obtaining Drawings and Specifications: If your company is not currently registered, you should do so by clicking "Register for an Account". You will receive an activation email to confirm your registration prior to signing in and ordering plans. Registered account holders may download digital files for a nominal fee. Prime bidders may have two (2) complete sets on a refundable basis if: 1) a responsible bid is received and documents are returned directly to the Office of the Architect in good condition within thirty (30) days of receipt of bids; 2) the prospective bidder notifies the Architect of his/her intention not to bid and returns the bidding documents in good condition at least seven (7) days prior to receipt of bids. Any plan holder not in conformance with Item 1 or 2 noted above will forfeit their plan deposit. Deposits should be made payable to Vincennes University. Estimated Range -$150,000 TO $175,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1. Remaining work not identified as work under other contracts. 2. Foundations, including footings, foundation walls. 3. Slabs-on-grade, including earthwork, subdrainage systems, and insulation. 4. Below-grade building construction, including excavation, backfill, and thermal moisture protection. 5. Exterior concrete stoops and equipment pads for all trades, as indicated/required in the construction documents. 6. Superstructure, including floors and roof construction. 7. Exterior closure, including walls, parapets, doors, windows, and louvers. 8. Roofing, including coverings, flashings, and roof specialties. 9. Interior construction, including partitions, doors, interior glazed openings, and fittings. 10. Fire-protection specialties (Fire extinguishers/cabinets). 11. Stairs, including railings and finishes. 12. Plastic laminate casework. 13. Interior finishes and finish carpentry. Bid Results: General Construction Wolfe Construction Co., Inc- $105,500.00 Mechanical Construction Mel-Kay Electric, Co-$35,175.00 Electrical Construction Mel-Kay Electric Co-$116,754 Schedule - 1. Notice to Proceed will be issued by April 29, 2022. 2. Access to Site: May 16, 2022. 3. Submittals: Within first 45 days. 4. Substantial Completion of all work is July 22, 2022 5. Final Completion: September 1, 2022

Award

Laboratories

$257,429.00

Public - State/Provincial

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
34
Bidding Soon
571
All Active Projects
249
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.