BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2024 at 8:00 PM

Updated March 12, 2024

Site work for a mixed-use development in Salt Lake City, Utah. Design plans call for site work for a transportation facility.

Plans call for inspection certification svcs, testing/geotechnical, hazardous materials service, commissioning svcs. As of March 11, 2024, the project is 60% design complete. A timeline to select a general contractor has not been disclosed. Construction is slated to begin earliest 2026, 2027/2028 depending on USACE review and approval.

Design

Water / Sewer

$35,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
93
Bidding Soon
960
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2026

Project location map

776 N Terminal Dr, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.