BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Martinsville, Virginia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Scratch and smooth existing road ( prepare the road for overlay) and overlay with one inch and three-quarters of asphalt. We request a bid for the entire road (Smith lake road from Forest street to the City Limits, 13,273 square yards) and a separate bid for part of the road (Smith Lake road to Village Street, 9054 square yards). We request a bid for the entire road (Smith lake road from Forest street to the City Limits, 13,273 square yards) and a separate bid for part of the road (Smith Lake road to Village Street, 9054 square yards). Specifications and paving schedule are attached. The Director of Public Works or his agent will accompany interested bidders over streets to be improved. Bids must be accompanied by a bid bond equal to five percent (5%) of the request, which may be forfeited if the successful bidder fails to execute the contract within ten (10) days after the award or fails to give satisfactory surety as required herein. A performance bond will be required in an amount equal to one hundred percent (100%) of the contract price conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor and furnishing materials for the project. The performance bond shall be executed by a surety company authorized to do business in the State of Virginia. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of thirty (30) days. All contractors are hereby notified that they must have a proper license under the Virginia State laws governing their respective trades The City of Martinsville, Virginia, reserves the right to reject any or all bids, to waive any and all informalities therein, and the award shall, if made, be made to the lowest responsive responsible bidder, or bidders, taking into consideration the quality of materials, labor, and equipment. Based upon the bids received, the City of Martinsville reserves the right to adjust the quantity of work to match available funding

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
53
Bidding Soon
1,231
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 28, 2022

img_map_placeholder

Smith Lake Rd, Martinsville, VA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.