BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a sidewalk / parking lot in Madison, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

In general the work consists of: expanding turning radii of Minuteman Drive at its connection to Wright Street including the addition of curb and gutter; removal and replacement of concrete sidewalk to accommodate the new turning radii; providing aggregate shoulders; saw cutting, removal, and replacement of asphalt pavement; providing a concrete slab for storage of mobile message sign board; providing new pavement markings; and repairing settlement along edge of existing sidewalk. Work also includes miscellaneous restoration of pavement and turf grass areas disturbed during construction.

Under Construction

Sidewalks / Parking Lot

$91,464.00

Public - State/Provincial

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
332
Active Projects
116
Bidding Soon
1,961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2022

May 26, 2022

Project location map

2400 Wright St, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.