BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a playground / park / athletic field in Fair Oaks, California. Completed plans call for the renovation of a playground / park / athletic field.

Renovation work around all sides of the park as bordered by Fair Oaks Boulevard, California Avenue, Temescal Street, Main Street and Park Drive. The total site is approximately 4 acres. The majority of the site will be renovated with the exception of the existing buildings and bandshell. - The work generally consists of, but not limited to the following: site demolition, roadway grinding, asphalt pavement restoration, traffic control, erosion control, site clearing, grading, tree protection, tree removal, drainage, water, fire water, sewer, gas, concrete pavement, curbs, gutters, asphalt pavement, permeable pavers, prefabricated restroom building, retaining walls, fencing, accessible ramps, trellis relocation, shade shelter, play equipment, embankment slide, rubber surfacing, electrical transformer, site lighting, accent lighting, site furnishings, landscaping and irrigation. a. The play equipment (reference location of purchase order) was purchased thru the District and includes the fabrication and delivery of the equipment to the site. b. Some of the site furniture was purchased thru the District (reference location of purchase order) and includes the fabrication and deliver of the site furniture to the site. The awarded contractor shall be responsible for scheduling the delivery, storage and installation of items 1 and 2 as noted in these contract documents. Village Park Community Center/Stage House and Amphitheatre improvements consists of: - Construction of a new 7,800 square ft Community Center and Stage House, renovation of existing Amphitheater seating area. Community Clubhouse and miscellaneous support buildings consists of: - Modifications to existing Community Clubhouse interior and exterior, new trash enclosure. New roofing of support building and Arts & Crafts Building. The Contract includes any other work as shown on the Project Plans, as specified in the contract documents and as directed by the District.

Award

Playgrounds / Parks / Athletic Fields

$21,300,000.00

Public - City

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
80
Bidding Soon
1,427
All Active Projects
594
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

May 30, 2022

img_map_placeholder

Multiple Locations, Fair Oaks, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.