Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Greenfield, Indiana. Contact the soliciting agency for additional information.
The City of Greenfield is looking for mowing contractors to submit bids to provide mowing, trimming, bush-hogging, and trash removal services on properties in violation of local weed, trash, and zoning ordinances. Description of anticipated work a. Weeds. Weeds, tall grass, and overgrown shrubs shall be trimmed to a length acceptable to the City. The general objective is to remove weeds and shorten tall grass; it is not necessary for high-quality finish mowing. Required work varies depending on site from finish mowing to bush-hogging. Grass and weed heights can range from 4" to more than 12". Hand trimming is not requested except for areas where the overgrowth cannot be mown or bush-hogged. Leaves and trimmings need not be raked or otherwise collected, unless necessary for compliance with City Codes or if directed to do so by the City. b. Trash. Trash and rubbish may need to be cleared and removed to accomplish (a) above, or as requested by the City. Such work may include collection and removal of blown debris (cans, papers, etc.), tables, fallen limbs, etc. c. Season. The expected time frame for work will be April through November, depending on weather conditions. All bids expire December 31 of the year submitted. Procedure for awarding jobs a. Bidding. The Board of Public Works and Safety shall select a pool of qualified contractors' bids to use during the mowing season, based on submitted bids (see below). b. Job selection. The City, on an as needed basis, shall contact the contractor with the lowest bid, with equipment appropriate for the job, and available on the needed schedule. The contractor will be notified of the required job by the City by phone, e-mail or fax with the address, scope of work, and any site-specific details. A work order detailing jobs to be done will be available for pickup for contractors requiring such. c. Equal work. The City will attempt to provide an equal amount of work to all contractors in the mowing pool, depending on qualifications, throughout the season.
Post-Bid
Municipal
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to Project Search, and five free projects and companies. Subscribe for complete access to all contacts and documents to unlock opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
April 12, 2022
April 19, 2022
Multiple Locations, Greenfield, IN
Related To This Project
Greenfield, IN
Bid Date: Apr 20 2022
Greenfield, IN
--
Greenfield, IN
Bid Date: Jul 23 2021
Greenfield, IN
Bid Date: May 24 2022
Greenfield, IN
Bid Date: May 05 2022
Greenfield, IN
--
Greenfield, IN
Bid Date: Apr 12 2022
Greenfield, IN
--
Greenfield, IN
Bid Date: Jul 10 2019
Greenfield, IN
Bid Date: Sep 11 2019
Greenfield, IN
Bid Date: Sep 02 2020
Greenfield, IN
Bid Date: Dec 11 2019
Greenfield, IN
Bid Date: Feb 05 2020
Greenfield, IN
Bid Date: Aug 05 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--