BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a mixed-use development in Syracuse, New York. Completed plans call for site work for a playground / park / athletic field.

Remove and replace pool filtration system, to pass New York State Health Codeat the Kirk Park Swimming Pool or the City of Syracuse Parks Department Remove old iron filters Remove old PVC plumbing Remove old steel security door Create new rough opening for new double door (the wall is brick) Install new composite fiberglass tanks wrapped in resin-impregnated fiberglass Install new PVC plumbing from the pool's main pump; a 6' - 8' flange shall be added and 8" to the filters then back to the pool return Install new 72" double door

Award

Swimming Pools

$129,500.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
138
Bidding Soon
1,464
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

April 29, 2022

Project location map

300 W Borden Ave, Syracuse, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.