Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2024 at 7:00 PM

Updated May 20, 2026

Site work for a civil project in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Culvert Replacement and Other Work 2:30 BF 75369 - Carrying Hwy. 2 over Pipestone Creek, 12 km SW of Millet kilometre 11.950 to 12.070 CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Demolition and Disposal of Bridge Structure 1 Lump Sum Excavation - Structural 187.76 Metres SPCSP - Supply (4.3 m Dia.) 187.76 Metres SPCSP - Assembly (4.3 m Dia.) 1 Lump Sum Backfill 1 Lump Sum Roadway Work 1 Kilometre New Fence - Supply and Install - Class B Contractor to supply all materials. Question Deadline 02/19/2024

Award

Bridges / Tunnels

$4,972,866.00

Public - State/Provincial

Site Work

8

9

8

3

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
37
Bidding Soon
569
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

April 1, 2024

Project location map

Multiple Locations, Edmonton, AB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed