BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an elderly care / assisted living facility in Newark, New York. Working plans call for the renovation of a elderly care / assisted living facility.

Final Date for Receipt of Questions: March 30, 2022 Official Responses to Questions by: April 1, 2022 Any questions not asked at the site visit must be submitted in writing to Fl.Procurement@opwdd.ny.gov within 2 business of the site visit. Vendors will receive a response within 2 business days after the deadline for submitting questions. All questions and answers will be e-mailed to all vendors that attended the mandatory site visit. This is a NYS public works project and prevailing wages must be paid. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% 1. Furnish materials and labor to Completely Install the Generator and Transfer Switch System as per engineered drawings by: Middleton Engineering, Dated: 6/16/2021 2. Upon completed installation, vendor must complete "Installation/Pre-Startup Check Sheet" and submit to Emergency Power Systems (EPS). A technician will be assigned to the job to review the work and start-up of generator forwarranty purposes. 3. Vendor must also contact Middleton Engineering for review of services performed. 4. All work will be inspected by: Middle Department Inspection Agency, and coordinated by FLDDSO Maintenance Point of Contact listed above. Please notify contact when inspection can be completed. Inspection documents must be submitted to the DDSO contact listed above before payment will be processed. 5. No splicing of service conductors is allowed in the system. Lug to lug connections are strictly enforced. 6. Panels must be re-wired as sub-panels for isolating neutrals. 7. All work to be done per New York State, Federal Regulations, and 2014 NEC code. 8. Test and tune equipment for optimal performance. Submit startup documentation forwarranty verification. 9. Generator and Transfer switch to be picked up by vendor @ Newark Transportation Building, Newark, NY. 10. No paymentwill be processed until all necessary documentation and inspections are satisfactorily on file. 11. Work to be completed and invoiced within 60 days of receipt of P.O.

Final Planning

Elderly Care / Assisted Living

$200,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
73
Bidding Soon
949
All Active Projects
537
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

November 7, 2022

img_map_placeholder

314 Madison St, Newark, NY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.