Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Bozeman, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Contract Award Date: Jun 12, 2022 Contract Award Number: 1240LU22C0016 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: H4B2JGMTKJU6 Contractor Awarded Name: ACME ASPHALT INDUSTRIES, INC. Contractor Awarded Address: Butte, MT 59701-1647 USA Base and All Options Value (Total Contract Value): $300169.00 Sol No: 1240LU22B0002-GAOA_CUSTER_GALLATIN_NATIONAL_FOREST-Jackson_Creek_Road_Improvements (a) Scope of Contract The scope of this project is to prepare the road surface (by grading, watering, and rolling) and install commercial source aggregate surfacing along with drainage structures and turnouts on Jackson Creek Road #977 on the BozemanRanger District, Custer Gallatin National Forest. Work includes furnishing alllabor, equipment, supervision, transportation, operating supplies, and incidentals necessary to perform road work on the road specified herein. All work and equipment shall be in compliance with the terms, specifications, andprovisions of this contract. All equipment shall be in good operating condition and shall be operated by competent, experienced operators experienced in the work. ) Project Location The project is located approx. 14 miles east of Bozeman, MT on the BozemanRanger District of the Custer Gallatin National Forest, See attached plans for detailed project location(s). Start of Work/Period of Performance It is estimated that the work can begin on June 16, 2022. The contractor shall be required to: 1) Commence work under this contract within 21 calendar days after the Notice to Proceed is received, 2) Prosecute thework diligently, and 3) Complete the entire project, ready for use, no later than September 30, 2022. The time stated for completion shall include final cleanupof the premises. No work shall be performed on weekends (5pm Friday until 7am Monday) orholidays. The completion date is based on the assumption that the successful offeror will receive the Notice to Proceed by June 1, 2022. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the Notice to Proceed, except to the extent that the delay in issuance of the Notice to Proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer. NOTE: Notify the Contracting Officers Representative(COR) of intent to beginwork at least 14 days in advance. Solicitation No: 1240LU22B0002 GAOA Jackson Creek Road Improvements (d) Submittals Fourteen (14) days prior to start of work contractor shall submit Traffic Control Plan and furnish Manufacturers Certificates and Data certifying that the followingmaterials conform to the requirements specified: Surface Course Aggregate and 18 inch Pipe Culvert. (e) Pre-bid Tour No formal site tour is planned; however, bidders are strongly encouraged to visit the sites prior to preparing and submitting their bid. Directional information maybe had by contacting Grant Morrison, Custer Gallatin National Forest SupervisorsOffice, Bozeman, Montana, telephone (406) 587-6724. (a) Traffic Control Road will remain open at all times, with 30 minute delays to public traffic allowed, single-lane two way traffic with flagger control is acceptable. The contractor shall provide, erect, and maintain all necessary barricades, suitable andsufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Suitable warning signs shall be provided to properly control and direct traffic. The contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road by traffic. All devices, flaggers, and pilot car operations shall conform to Part VI of the Manualon Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration, and applicable safety codes. (b) Protection of Existing Structures Fences, gates, cattleguards, culverts, and other structures adjacent to and withinthe project will be protected from damage by approved methods. (c) Final Clean-up - Remove all debris, rubbish, and excess material from theproject and off Forest Lands. MAGNITUDE OF CONSTRUCTION PROJECT Between $250,000 and $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$300,169.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2022
June 23, 2022
Jackson Creek Rd, Bozeman, MT
Related To This Project
Bozeman, MT
Bid Date: Sep 02 2022
Bozeman, MT
--
Bozeman, MT
Bid Date: Oct 05 2023
Bozeman, MT
Bid Date: Apr 15 2019
Bozeman, MT
Bid Date: Oct 27 2023
Bozeman, MT
--
Bozeman, MT
Bid Date: Mar 23 2022
Bozeman, MT
Bid Date: Apr 18 2022
Bozeman, MT
Bid Date: Mar 02 2022
Bozeman, MT
Bid Date: Mar 31 2022
Bozeman, MT
Bid Date: Mar 30 2022
Bozeman, MT
--
Bozeman, MT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.